Annexure-
A |
|
|
|
|
| Transmission - Details of Plan Provisions & Physical Targets for
Annual Plan 2009-10 (Revised) |
|
|
|
|
|
Rs. in lacs |
|
|
|
|
|
|
|
Annexure- A |
| Transmission - Details of
Plan Provisions & Physical Targets for Annual Plan 2009-10 (Revised)
& Annual Plan 2010-11 (Proposed) |
|
|
|
|
|
|
|
Rs. in lakhs |
| S.No. |
Scheme |
Category |
Line Length (Ckt. kM) |
Capacity (in MVA) |
Estimated Cost |
Working Target / Dt. of Comm. |
Annual
Plan 2009-10 (Revised) |
Annual
Plan 2010-11 (Proposed) |
| Provision |
Physical Targets |
Provision |
Physical Targets |
| Proposed |
Proposed |
| (Plan+Outside Plan) |
Ckt Km. |
MVA |
(Plan) |
Ckt Km. |
MVA |
| I |
765kV SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| A |
NEW START SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| |
Composite Power Evacuation
System {Chhabra Super Critical TPS (2x660MW) & Kalisindh TPS (2x600
MW)} |
|
|
|
|
|
|
|
|
|
|
|
| 1 |
MVA,
765/400 kV GSS at Phagi(Jaipur South) alongwith 2 sets of 765kV, 3x80 MVAR
(single phase) Line Reactors and 400kV, 1x125 MVAR Bus Reactor at Phagi
(Jaipur South) |
ES |
|
2x1500 |
83285.06 |
2013-14 |
1500 |
|
|
40000 |
|
|
| 2 |
400/765 kV GSS
at Anta(Baran) Pooling Station alongwith 2 sets of 765kV, 3x80 MVAR (single
phase) Line Reactors. |
ES |
|
2x1500 |
50463.53 |
2013-14 |
|
|
|
|
| 3 |
765 kV,2 X S/C Anta- Phagi(Jaipur
South) |
ES |
450 |
|
68161.38 |
2011-12 |
|
|
|
|
| |
I Total (765kV) |
|
|
|
|
|
1500 |
|
|
40000 |
|
|
| II |
400kV SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| A. |
ON GOING SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| 1 |
Ratangarh -
Merta link line including shunt reactors and allied equipments at Ratangarh
& Merta |
BPTS,LR,BVP |
181 |
|
8890.00 |
9.5.08 |
1100 |
|
|
100 |
|
|
| 2 |
400 kV S/C Jodhpur
- Merta line (Second ckt.) |
|
98 |
|
8332.12 |
2010-11 |
4300 |
|
|
1500 |
98 |
|
| |
DHOLPUR GTPS
Evacuation System (Phase-I) |
|
|
|
|
|
|
|
|
|
|
|
| 3 |
400kV S/C GTPS
Dholpur-Heerapura line with bay equipments including shunt reactors and
allied equipments at Heerapura |
ES |
295 |
|
10319.17 |
3.2.08 |
1550 |
|
|
550 |
|
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| |
CHHABRA TPS
Evacuation System(Stage I) (Phase I) |
|
|
|
|
|
|
|
|
|
|
|
| 4 |
400 kV D/C Chhabra
TPS - Dahra line |
ES |
261 |
|
|
13.2.09 |
|
|
|
|
|
|
| 5 |
400kV S/C Dahra
- Bhilwara line(10 kM D/C span at Bhilwara end) with 400 kV GSS at Bhilwara
(with 50 MVAR line reactor at Bhilwara) |
ES |
186 |
315 |
2009-10 |
186 |
315 |
|
|
| 6 |
400kV S/C Chhabra
- Hindaun line(400 kV D/C span length of 11.282 kM.at Hindaun end and D/C
span length of 25.5 kM at Chhabra end) with 400 kV GSS at Hindaun (with
50 MVAR line reactor at Hindaun) |
ES |
342 |
315 |
2009-10/ 2010-11 |
342 |
|
|
315 |
| 7 |
LILO of 400kV
Dholpur CCGT- Heerapura line at 400kV S/S Hindaun (with one 2 kM D/C length
at 400 kV GSS Hindaun end) |
ES |
9 |
|
25.11.09 |
9 |
|
|
|
| |
Evacuation of
KTPS (Unit-VII) |
|
|
|
|
|
|
|
|
|
|
|
| 8 |
Interconnecting line 400 kV D/C KTPS -Kota
(PG) on twin moose conductor (to
be charged on 220 kV) |
ES |
13 |
|
915.75 |
2009-10 |
Incl. in S.No.
4 |
13 |
|
Incl. in S.No.
4 |
|
|
| |
STPS Evacuation System (Unit-6) |
|
|
|
|
|
|
|
|
|
|
|
| 9 |
400kV S/C STPS
- Bikaner line with 400 kV S/S at Bikaner (with Switchable reactor) |
ES |
162 |
315 |
19039.40 |
2009-10 |
2300 |
162 |
315 |
1300 |
|
|
| |
RAJ WEST LTPS
Evacuation System (Phase-II) |
|
|
|
|
|
|
|
|
|
|
|
| 10 |
400 kV D/C Raj
West - Jodhpur line and 400 kV line bays at Jodhpur with Reactor on each
line |
ES |
418 |
|
40365.13 |
2010-11 |
|
|
|
|
418 |
|
| 11 |
400 kV D/C Raj
West - Barmer line with 400 kV bay at Barmer |
ES |
31 |
|
3308.11 |
2009-10 |
31 |
|
|
|
| |
WIND POWER
Evacuation in Jaisalmer/Barmer area (Phase - I) |
|
|
|
|
|
|
|
|
|
|
|
| 12 |
400 kV S/C Akal
(Jaisalmer) - Jodhpur line (10 kM D/C span length at both ends)(charged
on 220 kV) |
ES |
250 |
|
20156.15 |
2010-11 |
|
|
|
|
250 |
|
| 13 |
400 kV S/C Akal(Jaisalmer)
- Barmer line(10 kM D/C span length at both ends) (charged on 220 kV) |
ES |
143 |
|
12191.00 |
2009-10 |
143 |
|
|
|
| |
WIND POWER
Evacuation in Jaisalmer/Barmer area (Phase - II) |
|
|
|
|
|
|
|
|
|
|
|
| 14 |
400 kV GSS at
Akal(Jaisalmer) with 1x50 MVAR line Reactor & 1x50 MVAR Bus Reactor |
ES |
|
2x315 |
10712.74 |
2010-11 |
8000 |
|
|
5000 |
|
315 |
| 15 |
400 kV GSS at
Barmer |
ES |
|
315 |
6093.23 |
2009-10 |
|
315 |
|
|
| 16 |
1 No. 400 kV
bay with line Reactor at 400 kV GSS Jodhpur |
ES |
|
|
1596.44 |
2010-11 |
|
|
|
|
| B. |
NEW START SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| |
Composite Evacuation System [Chhabra Super Critical
TPS (2x660MW) and Kalisindh TPS (2x600 MW)] |
|
|
|
|
|
|
|
|
|
|
|
| 17 |
400/220 kV GSS
at Ajmer |
ES |
|
2x315 |
12334.01 |
2012-13 |
1000 |
|
|
7500 |
|
|
| 18 |
Terminal 400
kV Bays at existing 400 kV Substation at Heerapura |
ES |
|
|
996.09 |
2011-12 |
|
|
|
|
| 19 |
400 kV D/C (Quad
Moose) Kalisindh TPS -Anta(Baran) Pooling Station Line (For Kalisingdh TPS
) |
ES |
200 |
|
18948.83 |
2011-12 |
|
|
7000 |
|
|
| 20 |
400 kV D/C (Quad
Moose) Chhabra TPS - Anta(Baran) Pooling Station Line (For Chhabra TPS ) |
ES |
260 |
|
24632.16 |
2011-12 |
|
|
|
|
| 21 |
400
kV D/C (Twin Moose) Phagi (Jaipur South-765 kV ) - Ajmer Line |
ES |
250 |
|
11603.74 |
2011-12 |
|
|
|
|
| 22 |
400 kV D/C (Twin
Moose) Phagi (Jaipur South-765 kV ) - Heerapura Line |
ES |
80 |
|
3716.19 |
2012-13 |
|
|
|
|
| |
Power Evacuation of
Banswara Super Critical TPS |
|
|
|
|
|
|
|
|
|
|
|
| 23 |
400/220 kV GSS
at Udaipur alongwith 400kV, 1x80 MVAR Bus Reactor, 2x50MVAR Line Reactors at Udaipur end of 400kV
D/C Banswara TPS-Udaipur line and
2x50MVAR Line Reactors at Udaipur end of 400kV D/C Udaipur-Jodhpur (New)
line. |
ES |
- |
2x315 |
15214.3 |
2013-14 |
|
|
|
27500 |
|
|
| 24 |
400/220
kV GSS at Jodhpur (New) alongwith 400kV, 1x80 MVAR Bus Reactor at Jodhpur
(New), and 2x50MVAR Line Reactors at Jodhpur end of 400kV D/C Udaipur-Jodhpur(New)
line. |
ES |
- |
2x315 |
14790.96 |
2013-14 |
|
|
|
|
|
| 25 |
400/220
kV GSS at Chittorgarh alongwith 400kV, 1x80 MVAR Bus Reactor, and 2x50MVAR
Line Reactors at Chittorgarh end of 400kV D/C Banswara TPS-Chittorgarh line. |
ES |
- |
2x315 |
13834.05 |
2014-15 |
|
|
|
|
|
| 26 |
Terminal 400
kV Bays at existing 400kV Substation Bhilwara |
ES |
- |
|
2440.86 |
2013-14 |
|
|
|
|
|
| |
400kV Interconnecting Lines : |
ES |
|
|
|
|
|
|
|
|
|
| 27 |
400 kV D/C Banswara
TPS- Udaipur (Quad Moose) Line |
ES |
320 |
|
30315.48 |
2013-14 |
|
|
|
|
|
| 28 |
400 kV D/C Udaipur-
Jodhpur (New) (Twin Moose Line) |
ES |
490 |
|
22739.09 |
2013-14 |
|
|
|
|
|
| 29 |
400 kV D/C Banswara
TPS- Chittorgarh (Quad Moose) Line |
ES |
360 |
|
34104.37 |
2014-15 |
|
|
|
|
|
| 30 |
400 kV D/C Chittorgarh-Bhilwara
(Twin Moose) Line |
ES |
100 |
|
4644.14 |
2014-15 |
|
|
|
|
|
| 31 |
400 kV D/C Bhilwara-Ajmer
(Twin Moose) Line |
ES |
300 |
|
13923.6 |
2014-15 |
|
|
|
|
|
| 32 |
400 kV inter-connections
at 400/220 kV GSS at Jodhpur(New) by LILO of nearby 400 kV S/C lines (20
kms, 2xD/C) |
ES |
80 |
|
3716.19 |
2013-14 |
|
|
|
|
|
| |
Power Evacuation
Scheme of Suratgarh Super Critical TPS |
|
|
|
|
|
|
|
|
|
|
|
| 33 |
400/220
kV GSS at Babai (Jhunjhunu) alongwith 400kV, 1x80 MVAR Bus Reactor and 2x80MVAR
Line Reactors at Babai end of 400kV D/C Suratgarh TPS-Babai (Jhunjhunu)
line. |
ES |
- |
2x315 |
14388.31 |
2012-13 |
1000 |
|
|
22500 |
|
|
| 34 |
Terminal 400
kV Bays at existing 400 kV Substation Bikaner (with 400kV, 1x50 MVAR Shunt
Line Reactor at Bikaner end of 400kV S/C Bikaner-Merta line.) |
ES |
- |
|
2760.19 |
2012-13 |
|
|
|
|
| 35 |
Terminal 400
kV Bay at existing 400 kV Substation Mertacity with 400kV, 1x50 MVAR Shunt
Line Reactor at Merta end of 400kV S/C Bikaner-Merta line. |
ES |
- |
|
1387.99 |
2012-13 |
|
|
|
|
| 36 |
400/220 kV GSS
at Jaipur (North) |
ES |
- |
2x315 |
10112.39 |
2012-13 |
|
|
|
|
| |
400kV Interconnecting Lines : |
|
- |
|
|
|
|
|
|
|
| 37 |
400 kV
D/C Suratgarh TPS- Babai (Jhunjhunu)(Quad Moose) Line |
ES |
460 |
|
43576.58 |
2012-13 |
|
|
|
|
| 38 |
400 kV D/C Babai
(Jhunjhunu)- Jaipur (North) (Twin Moose) Line |
ES |
260 |
|
12067.71 |
2012-13 |
|
|
|
|
| 39 |
400 kV D/C Suratgarh
TPS- Bikaner (Twin Moose) Line |
ES |
340 |
|
15779.49 |
2012-13 |
|
|
|
|
| 40 |
400 kV S/C Bikaner-
Merta (Twin Moose) Line |
ES |
200 |
|
11899.74 |
2012-13 |
|
|
|
|
| |
II TOTAL
( 400kV ) |
|
|
|
|
|
41750 |
886 |
945 |
81150 |
766 |
630 |
| |
TARGET 400 kV - WORKING |
|
|
|
|
|
|
886 |
945/3 |
|
766 |
630/2 |
| |
- ACHIVEABLE |
|
|
|
|
|
|
500 |
945/3 |
|
750 |
630/2 |
| III |
220kV SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| A. |
ON GOING WORKS |
|
|
|
|
|
|
|
|
|
|
| . |
GIRAL LTPS Evacuation System
(Phase-I) |
|
|
|
|
|
|
|
|
|
| 1 |
220kV 2X S/C
Giral LTPS-Barmer lines |
ES |
67 |
|
3953.61 |
I ckt 31.03.06 II ckt 1.10.09 |
400 |
35 |
|
|
|
|
| 2 |
LILO of 220kV Amarsagar-Barmer line (one ckt. LILO
only) to Giral LTPS |
ES |
10 |
|
|
|
|
|
|
| 3 |
i) 220kV S/C
Barmer-Dhorimanna line with 220kV S/S at Dhorimanna |
ES |
72 |
100 |
27.03.07 |
|
|
|
|
|
| |
ii) 220 kV S/C
Dhorimanna - Bhinmal line |
ES |
92 |
|
|
|
|
|
|
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| 4 |
220 kV S/C Bhiwadi(400
kV PGCIL) - Neemrana line with 220 GSS at Neemrana (Alwar)
(Financed by NCRPB) |
LC,LR |
52 |
100 |
3398.90 |
21.9.08 |
150 |
|
|
50 |
|
|
| 5 |
LILO of one
ckt. of 220 kV D/C Bassi-Heerapura line at Indira Gandhi Nagar (Jagatpura
) with 220 kV Hybrid GSS at Indira Gandhi Nagar (Turnkey) |
LC |
18 |
2x100 |
6398.70 |
2010-11 |
3500 |
|
|
2700 |
18 |
100 |
| 6 |
220kV S/C line
Dhorimanna - Sanchore with 220kV S/S at Sanchore (Jalore) for Narmada Canal
Project ( Line-Turnkey) |
LC |
64 |
100 |
3199.88 |
2010-11 |
1200 |
|
|
1200 |
64 |
100 |
| |
Interconnecting
Lines |
|
|
|
|
|
|
|
|
|
|
|
| 7 |
Interconnecting line 220 kV S/C Kankroli(PG)
- Debari |
LC,SS |
63 |
|
1568.75 |
6.7.09 |
350 |
63 |
|
|
|
|
| 8 |
Opening of existing
220 kV Kota-Bhilwara (Ckt.No.1) and connecting its one end to 400 kV Kota(PG)
and another end to Kota-Jaipur (3rd Ckt) outside the 220 kV Sakatpura GSS
(LILO) |
SS |
11 |
|
40.49 |
2010-11 |
|
|
|
40 |
11 |
|
| |
GIRAL LTPS Evacuation
System (Phase-II) |
|
|
|
|
|
|
|
|
|
|
|
| 9 |
220 kV S/C Giral LTPS - Balotra |
ES |
103 |
|
1643.09 |
26.11.09 |
700 |
103 |
|
|
|
|
| |
Barsingsar LTPS Evacuation System |
|
|
|
|
|
|
|
|
|
|
|
| 10 |
220kV Barsingsar
- Phalodi line (Turnkey) |
ES |
140 |
|
3083.00 |
2010-11 |
1200 |
|
|
1200 |
140 |
|
| |
CHHABRA TPS
Evacuation System (Stage-I, Phase-I) |
|
|
|
|
|
|
|
|
|
|
|
| 11 |
220kV S/C Chhabra
TPS (400kV GSS RVUN) - Jhalawar (220kV GSS) line |
ES |
100 |
|
|
2010-11 |
3500 |
|
|
1000 |
100 |
|
| 12 |
LILO of 220kV S/C Bhilwara - Pali line at 400 kV S/S
Bhilwara |
ES |
10 |
|
19.8.09 |
10 |
|
|
|
| 13 |
LILO of 220kV
Bhilwara - Bali line at 400 kV S/S Bhilwara |
ES |
6 |
|
19.8.09 |
6 |
|
|
|
| 14 |
220kV D/C Hindaun
(400kV) - Hindaun (220kV) line |
ES |
16 |
|
9.9.09 |
16 |
|
|
|
| 15 |
220 kV S/C Hindaun
(400 kV GSS) - Mandawar line |
ES |
46 |
|
2009-10 |
46 |
|
|
|
| 16 |
220 kV S/C Chhabra
- Baran - Dahra line with 220 kV GSS at Baran |
ES |
138 |
100 |
26.05.09 |
138 |
100 |
|
|
| |
STPS Evacuation System (Unit-6) |
|
|
|
|
|
|
|
|
|
|
|
| 17 |
LILO of 220
kV S/C Bikaner - Sridungargarh line at 400 kV GSS at Bikaner |
ES |
2 |
|
Incl. in 400kV scheme |
2009-10 |
|
2 |
|
|
|
|
| 18 |
LILO of 220
kV S/C Bikaner - Nagaur line at 400 kV GSS Bikaner |
ES |
40 |
|
2009-10 |
40 |
|
|
|
| 19 |
220 kV S/C STPS
Suratgarh -Bhadra line with S/S at Bhadra ( Hanumangarh) (line-Turnkey) |
ES |
114 |
100 |
3980.10 |
23.04.09 |
600 |
|
100 |
50 |
|
|
| 20 |
220
kV S/C line to connect 400 kV STPS - Bikaner line near STPS with STPS end
of unutilised 220 kV STPS - Suratgarh line |
ES |
3 |
|
109.00 |
23.9.09 |
100 |
3 |
|
- |
|
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| 21 |
LILO of 220
kV S/C Heerapura - Kukas line at VKIA with 220 kV S/S at VKIA |
LC,SS |
2 |
100 |
2698.90 |
12.08.08 |
300 |
|
|
- |
|
|
| 22 |
LILO of 220
kV Ajmer - Phulera line at Kishangarh (Ajmer) with 220 kV GSS at Kishangarh |
LC,SS |
0.23 |
100 |
2490.40 |
12.08.08 |
300 |
|
|
- |
|
|
| 23 |
220 kV S/C Merta
- Makrana - Kuchaman line |
SS |
115 |
|
3067.90 |
2009-10 |
1100 |
108 |
|
100 |
|
|
| 24 |
LILO 220 kV
D/C Heerapura - Reengus line ( one ckt. LILO ) to Renwal with 220 kV S/S
at Renwal (Jaipur) |
LC,LR |
49 |
|
2709.76 |
28.05.09 |
1200 |
49 |
100 |
100 |
|
|
| 25 |
(i) LILO of
II ckt. of 220 kV D/C Bhiwadi (RVPN) - Alwar line with 220 kV GSS at Khushkhera |
LC,LR |
5 |
2x100 |
3263.58 |
3.1.09 |
500 |
|
|
400 |
|
|
| |
(ii) 220 kV
S/C Bhiwadi (PG) - Bhiwadi (RVPN) line |
|
10 |
|
2010-11 |
|
|
10 |
|
| 26 |
Stringing of
2nd ckt. of 220 kV Banswara - Debari line from Banswara to Salumber with
its connectivity to 132 kV GSS Salumber by laying 5 kM 220 kV D/C line (to
be charged on 132 kV) |
SS |
87 |
|
1253.00 |
18.8.09 |
500 |
87 |
|
|
|
|
| |
RAJ WEST LTPS
Evacuation System (Phase - I) |
|
|
|
|
|
|
|
|
|
|
|
| 27 |
220 kV D/C RajWest
- Barmer line (with two 220 kV bays at Barmer) |
ES |
27 |
|
1028.81 |
20.3.09 |
50 |
|
|
|
|
|
| 28 |
220 kV S/C RajWest
- Dhorimanna line (with one 220 kV bay at Dhorimanna end) (Turnkey) |
ES |
90 |
|
2318.68 |
2010-11 |
1000 |
|
|
900 |
90 |
|
| |
WIND POWER
Evacuation in Jaisalmer/Barmer area (Phase - I) |
|
|
|
|
|
|
|
|
|
|
|
| 29 |
LILO
of both the circuits of 220kV D/C Amarsagar-Barmer lines (17kM D/C each)
upto proposed 400kV Akal (Jaisalmer) GSS |
ES |
78 |
|
1317.90 |
2010-11 |
700 |
|
|
2000 |
78 |
|
| 30 |
220kV D/C lines
(3 circuits of 5kM D/C each) in approach span at proposed 400kV Akal (Jaisalmer)
GSS and 8 nos. 220 kV bays at 400 kV Akal(Jaisalmer) |
ES |
30 |
|
1541.55 |
2010-11 |
|
|
30 |
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| 31 |
LILO of 220
kV Duni-Heerapura line to SEZ -I with 220 kV GSS SEZ-I at Mahindra's SEZ,
Jaipur (Phase - I) |
LC |
15 |
100 |
2978.49 |
25.11.09 |
1850 |
15 |
100 |
200 |
|
|
| 32 |
220
kV S/C line from 220kV Bali GSS to connect with 220kV Pindwara line |
SS |
3 |
|
321.54 |
2009-10 |
150 |
3 |
|
100 |
|
|
| 33 |
220 kV S/C Kankroli (PG)-Kankroli
(RVPN) line |
SS |
8 |
|
265.87 |
2009-10 |
200 |
8 |
|
50 |
|
|
| 34 |
Jaipur City
EHV network strengthening scheme-1 |
|
|
|
|
|
|
|
|
|
|
|
| a |
220kV,
2x160 MVA capacity GIS Substation at Mansarovar (Jaipur) alongwith associated
lines and allied works |
|
|
|
|
2010-11 |
100 |
|
|
7500 |
|
|
| i. |
220 kV GIS
Substation at existing 132 kV Substation at Mansarovar (Jaipur) |
SS |
|
2x160 |
|
|
|
|
160 |
| ii. |
Up-gradation
of existing 132 kV D/C Line to 220 kV D/C Lines Between 220 kV Sanganer
to 220 kV Mansarovar (Proposed) |
SS |
19 |
|
|
|
|
19 |
|
| iii. |
2 Nos. 220
kV Terminal Bays at 220 kV Substation at Sanganer |
SS |
|
|
|
|
|
|
|
| iv. |
220
kV S/C Tapping Line on Tubular Pole/Narrow base Tower (1.5 Km), 220 kV D/C Composite Portion
on Tubular Pole/ Narrow base Tower (2
Km) by conversion of existing 132 kV S/C Heerapura-Sanganer Line & 220
kV XLPE Cable S/C (2.5 Km) from Tapping Point |
SS |
6 |
|
|
|
|
6 |
|
| v. |
1 Nos. 220
kV Terminal Bays at 400 or 220 kV Substation at Heerapura |
SS |
|
|
|
|
|
|
|
| vi. |
Up-grading
and Up-rating of existing 132 kV S/C Line to 132 kV D/C on Tubular Poles
between existing 132 kV GSS Mansarovar and 132 kV GSS Chambal and associated terminal bays and strengthening |
SS |
7 |
|
|
|
|
7 |
|
| vii. |
132 kV Terminal
Bay at existing 132 kV Substation at Chambal |
SS |
|
|
|
|
|
|
|
| b |
220kV
GIS Substation at Nallah Power House (Jaipur) alongwith associated lines
and allied works |
|
|
|
8289.37 |
2010-11 |
100 |
|
|
4500 |
|
|
| i. |
220 kV GIS
substation at existing 132 kV Nallah Power House, Jaipur |
SS |
|
2x160 |
|
|
|
|
160 |
| ii. |
Up-gradation
of existing 132 kV (S/C & D/C Sections) Line to 220 kV D/C Line Between
220 kV Heerapura to 220 kV Nallah Power House (Proposed) |
SS |
18 |
|
|
|
|
18 |
|
| iii. |
2 Nos. 220
kV Terminal Bays at 400 kV Heerapura/ 220 kV Substation at Heerapura |
SS |
|
|
|
|
|
|
|
| iv. |
Up-rating &
Refurbishment of 132 kV S/C Line between existing 220 kV Heerapura to 132
kV Chambal and associated strengthening of terminal bays. |
SS |
7 |
|
|
|
|
7 |
|
| c |
Up-gradation
of existing 132 kV Line |
|
|
|
|
2010-11 |
300 |
|
|
450 |
|
|
| i. |
Up-gradation
of existing 132 kV D/C Line to 220 kV D/C Lines (to be charged on 132 kV
for present) between 132 kV Kunda-Ki- Dhani to 132 kV Purana Ghat |
SS |
20 |
|
|
|
20 |
|
| 35 |
LILO of 220kV
S/C Chhabra TPS-Baran-Dahra line with 220kV GSS at Kawai
(Baran) |
ES |
2 |
100 |
2019.83 |
9.6.08 |
100 |
|
|
|
|
|
| 36 |
LILO of 220
kV S/C Bassi-Phulera line with 220kV GSS at Bagru I/A (Jaipur) |
LC,LR |
9 |
100 |
3347.51 |
2009-10 |
2500 |
9 |
100 |
250 |
|
|
| 37 |
LILO of 220kV S/C Jodhpur- Balotra line with 220kV GSS at Boranada I/A (Jodhpur) |
LC,LR |
2 |
100 |
3032.22 |
2009-10 |
2000 |
2 |
100 |
250 |
|
|
| 38 |
LILO of 220
kV Debari - Banswara line for 220 kV Madri with 220 kV GSS at Madri (Udaipur) |
LC,LR |
32 |
200 |
3412.72 |
2010-11 |
1200 |
|
|
1000 |
32 |
100 |
| 39 |
LILO of one
ckt. of existing 220 kV D/C KTPS - Beawar line at proposed 220 kV GSS Gulabpura |
LC,LR |
20 |
100 |
2436.92 |
2010-11 |
800 |
|
|
1200 |
20 |
100 |
| 40 |
i)LILO of proposed
220 kV S/C Badarpur - Alwar line at proposed 220 kV GSS MIA Alwar |
LC,LR |
10 |
100 |
|
2010-11 |
1200 |
|
|
1500 |
10 |
100 |
| |
ii)220 kV S/C
Mandawar -AlwarMIA line (Turnkey) |
|
56 |
|
2010-11 |
|
|
56 |
|
| 41 |
i)220 kV Khushkhera
- Neemrana line ( Turnkey) |
SS |
56 |
|
|
2010-11 |
1000 |
|
|
2200 |
56 |
|
| |
ii)220 kV D/C
Neemrana - Kotputli line (Turnkey) |
SS |
100 |
|
2010-11 |
|
|
100 |
|
| 42 |
LILO of one
ckt. of existing 220 kV D/C Bhiwadi - Alwar line at proposed 220 kV GSS
Kishangarh Bas with 220 kV GSS at Kishangarh Bas |
LC,LR |
4 |
100 |
2123.25 |
2010-11 |
700 |
|
|
1200 |
4 |
100 |
| 43 |
(i) LILO of 220 kV S/C Hissar - Khetri line with
220 kV GSS at Chirawa (Line-Turnkey) |
LC,SS |
40 |
100 |
|
2010-11 |
1000 |
|
|
3000 |
40 |
100 |
| 44 |
(ii) 220 kV S/C Bhadra - Chirawa line (Turnkey) |
SS |
125 |
|
2010-11 |
|
|
125 |
|
| 45 |
LILO of 220
kV S/C Sikar - Kuchamancity line at proposed 220 KV GSS Dhod with 220 kZV
GSS at Dhod (Sikar) |
LC,LR |
8 |
100 |
2905.17 |
2010-11 |
1200 |
|
|
1200 |
8 |
100 |
| 46 |
LILO of 220
kV S/C Bikaner - Nagaur line at proposed 220 kV GSS Nokha with 220 kV GSS
at Nokha ( Bikaner ) |
LC,LR |
10 |
100 |
3414.39 |
2010-11 |
1400 |
|
|
1400 |
10 |
100 |
| B. |
NEW START SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| 47 |
Jaipur EHV
network strengthening scheme-II |
SS |
|
|
|
|
|
|
|
|
|
|
| |
Phase -I |
|
|
|
|
|
|
|
|
|
|
|
| (i) |
220kV
GIS Substation at existing 132 kV Sub station at Puranaghat |
SS |
|
|
9892.30 |
2010-11 |
|
|
|
|
|
160 |
| (ii) |
2 Nos 220kV
Terminal Bays( one diameter) at 220 kV Sub station at Indira Gandhi Nagar
( Jagatpura) |
|
|
|
|
|
|
|
|
|
| (iii) |
2 Nos 220kV
Terminal Bays at 220 kV Sub station Kukas |
|
|
|
|
|
|
|
|
|
| (iv) |
Upgradation
of 132 kV S/C line to 220 kV D/C lines between 220kV Indira Gandhi Nagar
(Jagatpura) & 220kV Puranaghat |
SS |
8 |
|
|
|
|
|
8 |
|
| (v) |
New 220 kV D/C
lines between 220 kV Kukas to Kunda Ki Dhani (for connecting to already
approved 220 kV KK Dhani to Purana Ghat line) |
SS |
8 |
|
|
|
|
|
8 |
|
| (vi) |
LILO of one
ckt of 220kV D/C Kukas - Indira Gandhi Nagar Line at Puranaghat |
SS |
1 |
|
|
|
|
|
1 |
|
| (vii) |
Upgradation
of 132 kV D/C line to 220 kV D/C lines (to be charged on 132kV) between 220kV Puranaghat (Proposed) to 132 kV Jawahar Nagar |
SS |
14 |
|
|
|
|
|
14 |
|
| |
Phase -II |
|
|
|
|
|
|
|
|
|
| (viii) |
2nd Transformer
at 220kV GSS at Puranaghat |
SS |
|
160 |
|
2010-11 |
|
|
|
160 |
| 48 |
Interconnections
for 400 kV GSS Deedwana (RVPN Scope) |
|
|
|
|
|
|
|
|
|
|
|
| i. |
LILO
of proposed 220 kV S/C Kuchamancity - Dhod line at proposed 400 kV GSS Deedwana |
SS |
80 |
|
1849.58 |
2011-12 |
50 |
|
|
500 |
|
|
| 49 |
Interconnections
for 400 kV GSS Alwar (RVPN Scope) |
|
|
|
|
|
|
|
|
|
|
|
| i. |
LILO of existing
220 kV S/C Dausa-Alwar line at proposed 400 kV GSS Alwar |
SS |
20 |
|
673.31 |
2011-12 |
50 |
|
|
400 |
|
|
| ii. |
LILO
of 220 kV S/C Mandawar - Alwar (MIA) line at proposed 400 kV Alwar GSS |
SS |
20 |
|
673.31 |
2011-12 |
|
|
|
|
| 50 |
220 kV Interconnections
at PGCIL's 400/220 kV GSS at Bhinmal |
|
|
|
|
|
|
|
|
|
|
|
| i. |
LILO of 220
kV S/C Sirohi-Bhinmal line at PGCIL;s 400/220 kV Bhinmal GSS |
SS |
10 |
|
2486.33 |
2011-12 |
150 |
|
|
700 |
|
|
| ii. |
220 kV S/C line
from PGCIL's 400/220 kV Bhinmal GSS to RVPN's 220 kV GSS Bhinmal(covered
in Sr. no. iii below) |
SS |
|
|
2011-12 |
|
|
|
|
| iii. |
220 kV S/C line
from PGCIL's 400/220 kV Bhinmal GSS to RVPN's 220 kV GSS Sanchore(6.8 kM
D/C at 400 kV Bhinmal end & 4 kM D/C at 220 kV Sanchore end) |
SS |
82 |
|
2011-12 |
|
|
|
|
| 51 |
220 kV D/C line
to connect the LILO of 220 kV S/C Heerapura-Khetri line(second ckt.) to
LILO of one ckt. of 220 kV D/C Neemrana- Kotputli line |
SS |
100 |
|
2004.65 |
2011-12 |
150 |
|
|
600 |
|
|
| |
Composite Power Evacuation
System [Chhabra Super Critical TPS (2x660MW) and Kalisindh TPS (2x600 MW)] |
|
|
|
|
|
|
|
|
|
|
|
| 52 |
LILO 220kV Ajmer-Beawer
Line at 400kV Ajmer GSS |
ES |
20 |
|
408.5 |
2011-12 |
200 |
|
|
500 |
|
|
| 53 |
LILO 220kV Ajmer-Kishangarh
Line at 400kV Ajmer GSS |
ES |
20 |
|
408.5 |
2011-12 |
|
|
|
|
| 54 |
For
Kalisindh TPS (2x600MW): 220kV D/C Kalisindh-Jhalawar Line |
ES |
20 |
|
649.52 |
2011-12 |
|
|
|
|
| |
Power Evacuation
System of Banswara Super Critical TPS (2x660 MW) |
|
|
|
|
|
|
|
|
|
|
|
| |
220kV Interconnecting Lines : |
|
|
|
|
|
|
|
|
2000 |
|
|
| 55 |
220 kV Interconnections
at 400/220 kV GSS Udaipur |
ES |
50 |
|
2043.68 |
2013-14 |
|
|
|
|
|
| 56 |
220 kV Interconnections
at 400/220 kV GSS Chittorgarh |
ES |
50 |
|
2043.68 |
2013-14 |
|
|
|
|
|
| 57 |
220 kV Interconnections
at 400/220 kV GSS Jodhpur (New) |
ES |
50 |
|
2043.68 |
2013-14 |
|
|
|
|
|
| 58 |
220 kV D/C Banswara
TPS- Banswara (220 kV GSS) Line |
ES |
20 |
|
409.62 |
2013-14 |
|
|
|
|
|
| |
Power Evacuation
System of Suratgarh Super Critical TPS |
|
|
|
|
|
|
|
|
|
|
|
| |
220kV Interconnecting Lines : |
|
|
|
|
|
|
|
|
|
|
|
| 59 |
220 kV Interconnections
at 400/ 220 kV GSS Babai(Jhunjhunu) |
ES |
50 |
|
2044.79 |
2011-12 |
|
|
|
1000 |
|
|
| 60 |
220 kV Terminal
Bays at varios 400/220 kV Substations (6 No.) |
ES |
|
|
1078.12 |
2011-12 |
|
|
|
|
|
| 61 |
220 kV Interconnections
at 400/ 220 kV GSS at Jaipur (North) |
ES |
60 |
|
2453.3 |
2011-12 |
|
|
|
|
|
| |
Power Evacuation
System of Ramgarh GTPS (Stage-III)
: |
|
|
|
|
|
|
|
|
|
|
|
| 62 |
220/132kV, 2x100
MVA GSS at Dechu (New location) |
ES |
2x100 |
|
4307.69 |
2011-12 |
800 |
|
|
4800 |
|
|
| 63 |
220 kV D/C Ramgarh GTPP-Dechu line |
ES |
420 |
|
8655.07 |
2011-12 |
|
|
|
|
| 64 |
220kV S/C Dechu -Tinwari line |
ES |
80 |
|
1931.89 |
2011-12 |
|
|
|
|
| 65 |
220kV S/C Dechu -Phalodi line |
ES |
40 |
|
967.05 |
2011-12 |
|
|
|
|
| C |
Any other New
400 kV & 220 kV Scheme (to be identified) |
|
|
|
|
|
500 |
|
|
4000 |
|
|
| D |
220 kV Bus Bar Protection Scheme |
|
|
|
|
|
100 |
|
|
2000 |
|
|
| E |
Carried Over
Liabilities (Civil works & Bal.Elect. Works - 220kV & 400kV)of Sub Stations & Lines Commissioned in last
3 years only |
|
|
|
|
|
1000 |
|
|
800 |
|
|
| |
III. TOTAL (220kV
) |
|
|
|
|
|
37350 |
743 |
600 |
58240 |
1110 |
1540 |
| |
TARGET 220 kV - WORKING |
|
|
|
|
|
|
743 |
600/6 |
|
1110 |
1540/13 |
| |
- ACHIVEABLE |
|
|
|
|
|
|
500 |
500/5 |
|
600 |
800/8 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
| IV |
132kV SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| A. |
Carried Over
Liabilities for Civil works & balance Electrical works for S/S & Lines commissioned in last 3 years |
|
|
|
|
|
1000 |
|
|
800 |
|
|
| B. |
ON GOING SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| |
Normal Development
Schemes |
|
|
|
|
|
|
|
|
|
|
|
| 1 |
LILO of 132kV
Barmer - Gadra Road line to 220kV Barmer |
VR,LR |
15 |
|
|
2009-10 |
150 |
15 |
|
|
|
|
| 2 |
Sheo - Undoo
line with S/S at Undoo |
VR,LR |
48 |
25 |
1099.07 |
1.12.08 |
100 |
|
|
- |
|
|
| 3 |
Sawaimadhopur-Bhadoti
line with S/S at Bhadoti (Sawaimadhopur) Lline -Turnkey) |
VR,LR, LC |
30 |
25 |
1042.30 |
2009-10 |
400 |
30 |
25 |
100 |
|
|
| 4 |
Sujangarh(220kV)-Parewara
line with S/S at Parewara (Churu) (Line -Turnkey) |
VR,LR, LC |
37 |
25 |
1108.70 |
14.2.09 |
300 |
|
|
- |
|
|
| 5 |
S/C Dechu -
Kalau line with S/S at Kalau (Jodhpur) (Turnkey) |
VR,LR, LC |
27 |
25 |
1042.30 |
23.10.08 |
150 |
|
|
- |
|
|
| 6 |
Gharsana-Khajuwala
line with S/S at Khajuwala (Bikaner) (Turnkey) |
VR,LC |
62 |
25 |
1429.70 |
6.10.08 |
150 |
|
|
- |
|
|
| 7 |
132 kV GSS at
SMS Stadium (Hybrid S/S) (Turnkey) |
LC |
- |
2x50 |
2850.00 |
31.3.09 |
2000 |
|
|
200 |
|
|
| 8 |
Interconnection
of 220kV Sridungargarh |
|
|
|
|
|
|
|
|
|
|
|
| |
(i) 132
kV line from 220 kV Sri Dungargarh - 132 kV GSS Badnu |
LC |
28 |
|
- |
27.6.09 |
100 |
28 |
|
100 |
|
|
| 9 |
132 kV Jhalawar
(220 kV GSS) - Bhawani Mandi (via Kanwari) (Jhalawar-Kanwari section)(Bhawanimandi
- Kanwari section completed in 2008-09) |
SS,LR |
35 |
- |
618.10 |
27.7.09 |
200 |
21 |
|
|
|
|
| 10 |
LILO of 132kV
Banswara-Pratapgarh line to Dalot with 132kV S/S at Dalot
(Pratapgarh) |
VR,LR, LC |
47 |
25 |
1396.80 |
25.04.09 |
250 |
47 |
25 |
50 |
|
|
| 11 |
(i)
LILO of existing 132 kV S/C Puranaghat-Sitapura line at 220 kV Indira Gandhi
Nagar GSS |
LC |
2 |
|
Incl. in 220kV scheme |
2010-11 |
Incl. in 220kV scheme |
|
|
Incl. in 220kV scheme |
2 |
|
| |
(ii) 132/33kV
transformer at 220 kV Indira Gandhi Nagar GSS |
LC |
|
2x50 |
2010-11 |
|
|
|
50 |
| 12 |
132kV GIS Substation
at PWD Bunglow, Station Road, Jaipur ( at premises of existing TCC office)
( Turnkey) |
LC |
|
|
11682.70 |
2010-11 |
5000 |
|
|
2000 |
|
|
| |
(i) underground
cable from 132kV GSS Nallah Power House - PWD Bunglow |
|
10 |
|
|
|
|
|
10 |
|
| |
(ii) 132/33kV
conventional type transformer with 132kV & 33kV Gas Insulated Modules |
|
|
2x50 |
|
|
|
|
|
50 |
| |
(iii) 2 Nos
132kV extension bays at 132kV GSS Nallah Power House |
|
|
|
|
|
|
|
|
|
| |
Schemes for
Narmada Canal Project |
|
|
|
|
|
|
|
|
|
|
|
| 13 |
132kV S/C line
Sawa - Sata with 132kV S/S at Sata (Barmer) (Line -Turnkey) |
LC,LR |
50 |
25 |
1414.80 |
2010-11 |
650 |
|
|
650 |
50 |
25 |
| 14 |
132kV S/C line
Sanchore(220kV) - Galifa with 132kV S/S at Galifa (Jalore) (Line-Turnkey) |
LC,LR |
25 |
25 |
1176.25 |
2010-11 |
550 |
|
|
550 |
25 |
25 |
| 15 |
132kV interconnection
line LILO 132kV Bhadroona - Sanchore line at 220kV Sanchore ( Line -Turnkey) |
LC |
7 |
|
Incl. in 220kV
Sanchore |
2010-11 |
Incl. in 220kV
Sanchore |
|
|
Incl. in 220kV
Sanchore |
7 |
|
| |
CHHABRA TPS
Evacuation System (Stage I, Phase I) |
|
|
|
|
|
|
|
|
|
|
|
| 16 |
LILO of 132
kV Sangod - Baran at 220 kV GSS Baran |
ES |
7 |
|
Incl. in 400 kV Scheme |
2009-10 |
Incl. in 220 kV Scheme |
7 |
|
Incl. in 220 kV Scheme |
|
|
| 17 |
LILO of 132
kV Anta - Baran at 220 kV GSS Baran |
ES |
2 |
|
10.7.09 |
2 |
|
|
|
| |
Normal Development
Schemes |
|
|
|
|
|
|
|
|
|
|
|
| 18 |
132 kV GSS
Karauli - Sapotra line with S/S at Sapotra (Karauli) |
VR,LR |
35 |
25 |
1136.70 |
4.3.09 |
300 |
|
|
|
|
|
| 19 |
LILO of 132kV
VKI - Vaishali Nagar line to New Jhotwara with 132kV GIS S/S at New Jhotwara (Jaipur) (Turnkey) |
LC,LR |
4 |
2x50 |
3973.80 |
2010-11 |
2800 |
|
|
1000 |
4 |
50 |
| 20 |
LILO of 132kV
Morak - Jhalawar line to Mayla-Ramganjmandi with S/S at Mayla-Ramganjmandi
(Kota) |
VR,LR, LC |
9 |
25 |
939.43 |
27.3.09 |
250 |
|
|
|
|
|
| 21 |
LILO of 132kV
Kota - Sangod line to Deoli with 132kV S/S at Deoli
(Kota) |
LC,LR |
4 |
25 |
897.82 |
15.12.08 |
250 |
|
|
|
|
|
| 22 |
LILO of 132kV
Kota - Sangod line to Akelgarh water works
S/S at Akelgarh Water works (Kota) |
LC,LR |
4 |
25 |
877.02 |
2010-11 |
300 |
|
|
550 |
4 |
25 |
| 23 |
132 kV GSS
Aklera - Manoharthana line with S/S
at Manoharthana (Jhalawar) |
VR, LC |
38 |
25 |
1281.35 |
19.2.09 |
300 |
|
|
- |
|
|
| 24 |
132 kV S/C
line from 220 kV GSS Hanumangarh - Rawatsar with S/S at Rawatsar (Hanumangarh) |
VR,LR, LC |
40 |
25 |
1317.46 |
2010-11 |
750 |
|
|
350 |
40 |
25 |
| 25 |
LILO of 132kV
Bikaner - Sri Dungargarh (220kV) line to Dulchasar with S/S at Dulchasar (Bikaner) |
LC,LR |
19 |
25 |
1084.84 |
31.7.09 |
750 |
19 |
25 |
100 |
|
|
| 26 |
132 kV S/C
line from Badnu - Jasrasar with S/S at Jasrasar (Bikaner) (Line- Turnkey) |
LR,LC |
28 |
25 |
1317.46 |
2009-10 |
1000 |
28 |
25 |
170 |
|
|
| 27 |
132 kV S/C
line from 220 kV GSS Sri Dungargarh -Riri with S/S at Riri (Bikaner) (Line-
Turnkey) |
LR,LC |
16 |
25 |
1088.51 |
2009-10 |
850 |
16 |
25 |
150 |
|
|
| 28 |
132 kV S/C
Lohawat - Matora line with S/S at Matora (Jodhpur) |
LR,LC |
28 |
25 |
1196.95 |
27.11.08 |
250 |
|
|
- |
|
|
| 29 |
LILO of 132kV
Bhinmal- Gudamalani line to Bagora with
S/S at Bagora (Jalore) |
VR,LR, LC |
13 |
25 |
980.93 |
2009-10 |
350 |
13 |
25 |
100 |
|
|
| 30 |
132 kV S/C
line from 220 kV GSS Banswara - Paloda with S/S at Paloda
(Banswara) (line to be commissioned) |
VR,LR, LC |
35 |
25 |
1257.21 |
18.8.09 |
900 |
35 |
25 |
100 |
|
|
| 31 |
132 kV S/C
line from Salumber - Dhariyawad with S/S
at Dhariyawad (Pratapgarh) (Line- Turnkey) |
VR,LR |
69 |
25 |
1546.42 |
2010-11 |
800 |
|
|
700 |
69 |
25 |
| 32 |
132 kV S/C
line from 220 kV GSS Nagaur - Jayal
with S/S at Jayal ( Nagaur) (Line- Turnkey) |
LC |
48 |
25 |
1413.94 |
2009-10 |
1100 |
48 |
25 |
200 |
|
|
| 33 |
i) LILO of
Existing 132 kV S/C VKIA - Kukas line at 220 kV GSS VKIA |
LC,SS |
1 |
|
Incl. in 220kV Scheme |
2009-10 |
Incl. in 220kV Scheme |
1 |
|
|
|
|
| |
ii) Extension
of Existing 132 kV S/C VKIA - Pratap Steel line upto 220 kV GSS VKIA |
LC,SS |
4 |
|
2009-10 |
4 |
|
|
|
| |
iii) 132/33
kV Transformers at 220 kV GSS VKIA |
|
|
2x50 |
|
|
|
|
|
| 34 |
(i) LILO of
132 kV Ajmer - Kishangarh line at 220 kV GSS Kishangarh (Ajmer) |
LC,SS |
10 |
|
Incl. in 220kV scheme |
28.11.08 |
Incl. in 220kV scheme |
|
|
|
|
|
| |
(ii) LILO of
132 kV Phulera-Kishangarh line at 220 kV GSS Kishangarh (Ajmer) |
LC,SS |
24 |
|
27.6.09 |
24 |
|
|
|
| 35 |
LILO of 132
kV S/C Bharatpur -Alwar line at Kumher with S/S at Kumher (Bharatpur) |
VR,LR |
6 |
25 |
988.60 |
30.7.09 |
300 |
6 |
25 |
50 |
|
|
| 36 |
LILO of RPS - Mandalgarh line at Bijolia with S/S
at Bijolia (Bhilwara) |
VR,LR |
29 |
25 |
1154.10 |
2009-10 |
550 |
29 |
25 |
150 |
|
|
| 37 |
132 kV D/C
line from 220 kV SEZ-I to 132 kV SEZ-I with 132 kV GSS at SEZ-I |
LC |
4 |
25 |
1175.82 |
2010-11 |
350 |
|
|
700 |
4 |
25 |
| 38 |
LILO 132kV
Kotputli-Shahpura line for 132 kV
Paota with 132kV GSS at Paota (Jaipur) |
LC,LR |
10 |
25 |
1173.95 |
2010-11 |
550 |
|
|
550 |
10 |
25 |
| 39 |
132kV S/C Behror
- Jakharana line with 132kV GSS at
Jakharana(Alwar) ( Line- Turnkey) |
LC,LR |
17 |
25 |
1286.50 |
2009-10 |
800 |
17 |
25 |
200 |
|
|
| 40 |
132kV S/C Kawai-Atru line with 132kV GSS at Atru (Baran) |
LC,LR |
19 |
25 |
1313.72 |
2010-11 |
350 |
|
|
900 |
19 |
25 |
| 41 |
LILO 132kV
Bundi-Deoli line for 132 kV Hindoli with 132kV GSS at Hindoli (Bundi) |
LC,LR |
10 |
25 |
1173.95 |
2010-11 |
300 |
|
|
750 |
10 |
25 |
| 42 |
132kV S/C Ranoli
- Khandela Mod line with 132kV GSS at Khandela Mod (Sikar) |
LC,LR |
26 |
25 |
1409.03 |
2009-10 |
1100 |
26 |
25 |
250 |
|
|
| 43 |
LILO 132kV
Kotputli-Neem Ka Thana line for 132 kV Patan with 132kV GSS at Patan (Sikar) |
LC,LR |
4 |
25 |
1126.39 |
27.04.09 |
600 |
4 |
25 |
100 |
|
|
| 44 |
LILO 132kV
Chittor-Hamirgarh line for 132 kV Rashmi with 132kV GSS at Rashmi (Chittorgarh)
(Line- Turnkey) |
LC,LR |
40 |
25 |
1530.64 |
2010-11 |
750 |
|
|
700 |
40 |
25 |
| 45 |
LILO 132kV
RPS-Bhilwara line for 132 kV Beegod with 132kV GSS at Beegod
(Bhilwara) |
LC,LR |
2 |
25 |
1078.83 |
23.3.09 |
600 |
|
|
|
|
|
| 46 |
132kV S/C Madri-Dakan
Kotda (Transport Nagar) line with 132kV GSS at Dakan Kotda (Transport Nagar),
Udaipur |
LC |
10 |
25 |
1191.19 |
2010-11 |
300 |
|
|
750 |
10 |
25 |
| 47 |
132kV Saradhna-Pushkar
Road- MDS University with 132kV GSS at Pushkar Road (Ajmer) (Line- Turnkey) |
LC,LR |
29 |
25 |
1613.64 |
2010-11 |
850 |
|
|
700 |
29 |
25 |
| 48 |
132kV S/C Jhunjhunu
(220kV)- Bherunda Kalan- Sultana with 132kV GSS at Bherunda Kalan (Jhunjhunu) |
LC |
34 |
25 |
1681.71 |
2009-10 |
1250 |
34 |
25 |
150 |
|
|
| 49 |
LILO 132kV
Jalore-Siwana line for 132 kV Mandawala with 132kV GSS at Mandawala (Jalore) |
LC,LR |
3 |
25 |
1150.17 |
3.09.09 |
700 |
3 |
25 |
150 |
|
|
| 50 |
LILO 132kV
Jodhpur-Baori line for 132 kV Jhalamand with 132kV GSS at Jalamand (Jodhpur) |
LC,LR |
4 |
25 |
1078.83 |
2010-11 |
150 |
|
|
700 |
4 |
25 |
| 51 |
LILO 132kV
Pali-Falna line for 132 kV Tagore Nagar
with 132kV GSS at Tagore Nagar (Pali) |
LC |
4 |
25 |
1102.61 |
2010-11 |
500 |
|
|
500 |
4 |
25 |
| 52 |
LILO 132kV
Bhiwadi (RVPN)- Kushkhera line for 132 kV Chopanki I/A with 132kV GSS at
Chopanki I/A, (Alwar) |
LC,LR |
20 |
25 |
1197.73 |
2009-10 |
800 |
20 |
25 |
150 |
|
|
| 53 |
LILO 132kV
Kotputli- Behror line for 132 kV Keshwana I/A with 132kV GSS at Keshwana
I/A (Jaipur) |
LC,LR |
4 |
25 |
1173.95 |
2010-11 |
400 |
|
|
650 |
4 |
25 |
| 54 |
LILO 132kV
Kishangarh- Malpura line for 132 kV Silora I/A with 132kV GSS at Silora I/A (Ajmer) |
LC,LR |
13 |
25 |
1292.84 |
24.3.09 |
600 |
|
|
|
|
|
| 55 |
(i)
LILO 132 kV S/C Bhankrota-Bagru line at proposed 220kV GSS Bagru |
LC,LR |
7 |
|
Incl. in 220kV scheme |
2009-10 |
Incl. in 220kV scheme |
7 |
|
Incl. in 220kV scheme |
|
|
| |
(ii) 132kV/33kV
Transformers at 220kV GSS Bagru I/A (Jaipur) |
LC,LR |
|
2X25 |
2009-10 |
|
25 |
|
|
| 56 |
132kV/33kV
Transformers at 220V GSS Boranada I/A (Jodhpur) |
LC,LR |
|
2X25 |
Incl. in 220kV
scheme |
2009-10 |
Incl. in 220kV
scheme |
|
25 |
Incl. in 220kV
scheme |
|
|
| 57 |
132 kV S/C
Dhod - Losal line (Line- Turnkey) |
SS |
16 |
|
Incl. in 220
kV Dhod |
2010-11 |
Incl. in 220
kV Dhod |
|
|
Incl. in 220
kV Dhod |
16 |
|
| 58 |
132 kV Dhod
- Kachhawa line (Line- Turnkey) |
SS |
22 |
|
Incl. in 220
kV Dhod |
2010-11 |
Incl. in 220
kV Dhod |
|
|
Incl. in 220
kV Dhod |
22 |
|
| 59 |
132 kV D/C
Nokha - Jasrasar line (Line- Turnkey) |
SS |
80 |
|
Incl. in 220
kV Nokha |
2010-11 |
Incl. in 220
kV Nokha |
|
|
Incl. in 220
kV Nokha |
80 |
|
| 60 |
LILO 132 kV
Sikar - Udaipurwati line for 132 kV Piprali with 132 kV GSS at Piprali (Sikar) |
LC,LR |
7 |
25 |
1207.84 |
30.05.09 |
600 |
7 |
25 |
100 |
|
|
| 61 |
132kV S/C Buhana-Mahapalwas
with 132 kV GSS at Mahapalwas (Jhunjhunu) (Line- Turnkey) |
LC,LR |
23 |
25 |
1423.7 |
2010-11 |
250 |
|
|
900 |
23 |
25 |
| 62 |
132kV S/C Surajgarh-
Dulaniya with 132 kV GSS at Dulaniya (Jhunjhunu) (Line- Turnkey) |
LC,LR |
18 |
25 |
1355.62 |
2010-11 |
250 |
|
|
700 |
18 |
25 |
| 63 |
LILO
132kV Bhilwara-Pali line for 132 kV Karera with 132 kV GSS at Karera (Bhilwara) |
VR,LR |
6 |
25 |
1181.9 |
2010-11 |
300 |
|
|
700 |
6 |
25 |
| 64 |
132kV S/C Kishangarh-Roopangarh
with 132 kV GSS at Roopangarh (Ajmer) |
LC,LR |
25 |
25 |
1450.92 |
2010-11 |
350 |
|
|
650 |
25 |
25 |
| 65 |
LILO 132kV
Khetri-Gudha Gorji for132 kV Nangli with
132 kV GSS at Nangli (Jhunjhunu) |
LC,LR |
4 |
25 |
1158.12 |
2010-11 |
100 |
|
|
700 |
4 |
25 |
| 66 |
LILO 132kV
Bhilwara-Rayla line for 132 kV Danta
with 132 kV GSS at Danta (Bhilwara) |
VR,LC |
10 |
25 |
1229.46 |
2010-11 |
350 |
|
|
800 |
10 |
25 |
| 67 |
132kV LILO
of 132 kV Nimbaheda - Sawa line for Bhadesar with 132 kV GSS at Bhadesar
(Chittorgarh) |
VR,LC |
24 |
25 |
1395.92 |
2010-11 |
400 |
|
|
800 |
24 |
25 |
| 68 |
LILO 132kV
Khinwsar-Soyla line for 132 kV Narwa
with 132 kV GSS at Narwa (Hanuman Nagar) (Nagaur) |
LC |
30 |
25 |
1467.26 |
2010-11 |
300 |
|
|
700 |
30 |
25 |
| 69 |
LILO 132kV
Dhaurimanna-Sawa line for 132 kV Ranasar with 132 kV GSS at Ranasar (Barmer) |
LC |
12 |
25 |
1253.24 |
2010-11 |
200 |
|
|
900 |
12 |
25 |
| 70 |
132kV S/C Reodar-
Badgaon line with 132 kV GSS at Badgaon (Jalore) |
LC,LR |
32 |
25 |
1546.23 |
2010-11 |
650 |
|
|
700 |
32 |
25 |
| 71 |
LILO 132kV
Suratgarh-Anoopgarh line for 132 kV Sri Vijaynagar with 132 kV GSS at Sri
Vijaynagar (Sriganganagar) |
VR,LR |
30 |
25 |
1467.26 |
2010-11 |
250 |
|
|
900 |
30 |
25 |
| 72 |
132kV S/C line
from 220kV Phalodi-Bap line with 132 kV GSS at Bap (Jodhpur) (Line- Turnkey) |
VR,LR |
30 |
25 |
1519 |
2010-11 |
250 |
|
|
1100 |
30 |
25 |
| 73 |
132kV S/C Pilibanga-
Guluwala line with 132 kV GSS at Guluwala (Hanumangarh) |
LC,LR |
25 |
25 |
1450.92 |
2010-11 |
250 |
|
|
1000 |
25 |
25 |
| 74 |
132kV S/C Dechu-Sanwreej
line with 132 kV GSS at Sanwreej (Jodhpur) (Line- Turnkey) |
LC,LR |
24 |
25 |
1437.31 |
2010-11 |
250 |
|
|
1100 |
24 |
25 |
| 75 |
LILO 132kV
Alwar-Mandawar line for 132 kV Pinan with 132 kV GSS Pinan (Alwar) |
LC,LR |
6 |
25 |
1181.9 |
2010-11 |
150 |
|
|
800 |
6 |
25 |
| 76 |
132kV S/C line
from 220kV Dholpur-Roopwas with 132 kV GSS at Roopwas (Bharatpur) ( Line-
turnkey) |
VR,LR |
50 |
25 |
1791.29 |
2010-11 |
300 |
|
|
900 |
50 |
25 |
| 77 |
132kV S/C Phulera-Dudu
line with 132 kV GSS at Dudu (Jaipur) |
VR,LC |
25 |
25 |
1450.92 |
2010-11 |
20 |
|
|
1000 |
25 |
25 |
| 78 |
132kV S/C Balawala-Phagi
line with 132 kV GSS at Phagi (Jaipur) |
VR,LC |
20 |
25 |
1382.85 |
2010-11 |
400 |
|
|
850 |
20 |
25 |
| 79 |
LILO 132kV
Hindaun-Gangapur line for 132 kV Baroli with 132 kV GSS at Baroli (Sawaimadhopur) |
VR,LC |
16 |
25 |
1300.8 |
2010-11 |
200 |
|
|
800 |
16 |
25 |
| 80 |
LILO 132kV
Hingonia-Heerapura line for 132 kV Champapura with 132 kV GSS at Champapura,
Kalwar Road, Jaipur (Jaipur) |
LC,LR |
10 |
25 |
1229.46 |
2010-11 |
200 |
|
|
650 |
10 |
25 |
| 81 |
LILO 132kV
Kota-Modak line for 132 kV Mandana with 132 kV GSS at Mandana Town (Kota) |
LC,LR,VR |
16 |
25 |
1300.8 |
2010-11 |
200 |
|
|
750 |
16 |
25 |
| 82 |
LILO 132 kV
Bundi-Kota line for 132 kV Talera with 132 kV GSS at Talera (Bundi) |
LC,LR,VR |
16 |
25 |
1300.8 |
2010-11 |
150 |
|
|
750 |
16 |
25 |
| 83 |
132kV S/C Baseri
-Sarmathura line with 132 kV GSS at Sarmathura (Dholpur) ( Line- Turnkey) |
VR,LR |
35 |
25 |
1587.07 |
2010-11 |
250 |
|
|
900 |
35 |
25 |
| 84 |
LILO Jalore
- Jeewana line at Sayla |
SS |
4 |
|
180.9 |
2009-10 |
150 |
4 |
|
30 |
|
|
| C. |
NEW START SCHEMES |
|
|
|
|
|
|
|
|
|
|
|
| 85 |
132kV S/C Zawarmines - Rishabdeo
line |
SS |
35 |
|
671.02 |
2010-11 |
150 |
|
|
450 |
35 |
|
| 86 |
132kV S/C Duni
- Deoli line |
SS |
35 |
|
671.02 |
2010-11 |
150 |
|
|
450 |
35 |
|
| |
Interconnections
for 400 kV GSS Deedwana (RVPN Scope) |
|
|
|
|
|
|
|
|
|
|
| 87 |
132
kV D/C interconnecting line between proposed 400 kV Deedwana GSS and existing
132 kV Deedwana GSS |
SS |
20 |
|
734.64 |
2011-12 |
100 |
|
|
200 |
|
|
| |
Interconnections
for 220 kV GSS Nawalgarh (RVPN Scope) |
|
|
|
|
|
|
|
|
|
|
| 88 |
LILO of existing
132 kV S/C Koodan - Nawalgarh line to proposed 220 kV Nawalgarh GSS |
SS |
8 |
|
283.87 |
2011-12 |
200 |
|
|
400 |
|
|
| 89 |
132 kV S/C
Nawalgarh(220 kV) - Kumawas line |
SS |
22 |
|
489.43 |
2011-12 |
|
|
|
|
| 90 |
132 kV S/C
Nawalgarh(220 kV) - Gudagorji line |
SS |
34 |
|
653.58 |
2011-12 |
|
|
|
|
| 91 |
132 kV S/C
Nawalgarh(220 kV) - Udaipurwati line |
SS |
30 |
|
598.86 |
2011-12 |
|
|
|
|
| |
Power Evacuation
System of Ramgarh GTPS (Stage-III)
: |
|
|
|
|
|
|
|
|
|
|
|
| 92 |
LILO of existing
132kV S/C Dechu-Pokran line at proposed 220kV Dechu GSS |
ES |
2 |
|
26.03 |
2011-12 |
Incl. in 220 kV scheme |
|
|
Incl. in 220 kV scheme |
|
|
| 93 |
LILO of existing
132kV S/C Dechu-Phalodi line at proposed 220kV Dechu GSS |
ES |
8 |
|
100.8 |
2011-12 |
|
|
|
|
| |
Normal Development
Works |
|
|
|
|
|
|
|
|
|
|
|
| 94 |
LILO
of 132 kV Hindaun-Todabhim line with 132 kV GSS at Daula Kunwa(Bada Khora)
(Dausa) |
LC,LR,VR |
1 |
25 |
1364.19 |
2012-13 |
100 |
|
|
200 |
|
|
| 95 |
LILO of 132 kV Kishangarh
Bas-Khushkhera line with 132 kV GSS at PUR, Kotkasim(Alwar) |
LC,LR,VR |
30 |
25 |
1725.59 |
2012-13 |
100 |
|
|
200 |
|
|
| 96 |
LILO of 132
kV Alwar-Bansur line with 132 kV GSS at Vijay Mandir, Alwar City(Alwar) |
LC,LR,VR |
6 |
25 |
1426.49 |
2012-13 |
100 |
|
|
200 |
|
|
| 97 |
LILO of 132
kV Todabhim-Sikandra line with 132
kV GSS at Sikrai(Dausa) |
LC,LR |
6 |
25 |
1426.49 |
2012-13 |
100 |
|
|
200 |
|
|
| 98 |
132 kV S/C
Shri Mahaveerji GSS-Nangal Sherpur line with 132 kV GSS at Nangal Sherpur
(Karauli) |
LC,LR,VR |
20 |
25 |
1642.71 |
2012-13 |
100 |
|
|
200 |
|
|
| 99 |
LILO of 132
kV Hindaun-Todabhim line with 132
kV GSS at Mahuwa (Dausa) |
LC |
16 |
25 |
1551.12 |
2012-13 |
100 |
|
|
200 |
|
|
| 100 |
LILO of 132
kV Jamwa Ramgarh-Rajgarh line with 132 kV GSS at Andhi (Jaipur) |
LR,VR |
6 |
25 |
1426.49 |
2012-13 |
100 |
|
|
200 |
|
|
| 101 |
LILO of 132kV
Heerapura-VKIA-Rampura Dabri line with 132 kV GSS
at RIICO, Sarna Doongar (Jaipur) |
LC,LR,VR |
4 |
25 |
1401.57 |
2012-13 |
100 |
|
|
200 |
|
|
| 102 |
132 kV S/C Karauli -Kaila Devi line with 132 kV GSS
Kaila Devi (Karauli) |
LC,LR,VR |
25 |
25 |
1715.46 |
2012-13 |
100 |
|
|
200 |
|
|
| 103 |
132 kV S/C Karauli -Mandrayal line with 132 kV GSS
Mandrayal (Karauli) |
LR,VR |
45 |
25 |
2006.46 |
2012-13 |
100 |
|
|
250 |
|
|
| 104 |
LILO of 132 kV Jodhpur-Bilara
line with 132 kV GSS at SEZ, Kaparda (Jodhpur) |
LC |
10 |
25 |
1476.34 |
2012-13 |
50 |
|
|
100 |
|
|
| 105 |
LILO of 132
kV Padampur-Sri Ganganagar line with
132 kV GSS at Telewala (Sri Ganganagar) |
LC,LR,VR |
12 |
25 |
1501.27 |
2012-13 |
100 |
|
|
200 |
|
|
| 106 |
132 kV S/C
Momasar-Patlisar Fanta line with 132 kV GSS Patlisar Fanta (Churu) |
LC,LR,VR |
15 |
25 |
1569.96 |
2012-13 |
100 |
|
|
200 |
|
|
| 107 |
LILO of Sawa-Sata
line with 132 kV GSS at Sedwa (Barmer) |
LC,LR,VR |
4 |
25 |
1401.57 |
2012-13 |
100 |
|
|
200 |
|
|
| 108 |
132 kV Padroo-Junameetha
Khera-Sindhari line with 132 kV GSS at Junameetha Khera (Barmer) |
LC,LR,VR |
40 |
25 |
2117.09 |
2012-13 |
100 |
|
|
250 |
|
|
| 109 |
132 kV S/C
Sanchore ( 220kVGSS )- Paladar line with 132 kV GSS at Paladar (Jalore) |
LC,LR,VR |
15 |
25 |
1569.96 |
2012-13 |
100 |
|
|
200 |
|
|
| 110 |
132 kV S/C
Riri-Upani line with 132 kV GSS at Upani (Bikaner) |
LC,LR,VR |
13 |
25 |
1540.86 |
2012-13 |
100 |
|
|
200 |
|
|
| 111 |
132 kV S/C
Sri Karanpur - Kaminpura line with 132 kV GSS at Kaminpura (Sri Ganganagar) |
LC,LR,VR |
25 |
25 |
1715.46 |
2012-13 |
100 |
|
|
200 |
|
|
| 112 |
LILO of 132 kV Neem Ka Thana-Khetri line with 132
kV GSS at Babai (Jhunjhunu) |
LC,LR,VR |
10 |
25 |
1476.34 |
2012-13 |
100 |
|
|
200 |
|
|
| 113 |
LILO of 132 kV MDSU-Bherunda line with 132 kV GSS
at Pushkar (Ajmer) |
LC,VR |
16 |
25 |
1551.12 |
2012-13 |
100 |
|
|
200 |
|
|
| 114 |
LILO of 132
kV Beawar-Nasirabad line with 132
kV GSS at Kharwa (Ajmer) |
LR,VR |
10 |
25 |
1476.34 |
2012-13 |
100 |
|
|
200 |
|
|
| 115 |
132 kV S/C
Kankroli (220kV) -Sapol line with 132 kV GSS at Sapol (Rajsamand) |
LC,VR |
23 |
25 |
1686.36 |
2012-13 |
100 |
|
|
200 |
|
|
| 116 |
LILO of 132
kV Banswara-Sagwara line with 132
kV GSS at Partapur(Banswara) |
LC,LR,VR |
22 |
25 |
1625.89 |
2012-13 |
100 |
|
|
200 |
|
|
| 117 |
132 kV S/C
Mavli - Sanwad line with 132 kV GSS at Sanwad (Udaipur) |
LC,LR,VR |
20 |
25 |
1642.71 |
2012-13 |
100 |
|
|
200 |
|
|
| 118 |
132 kV S/C
Shri Madhopur - Thoi line with 132 kV GSS at Thoi (Sikar) |
LC,LR,VR |
21 |
25 |
1657.26 |
2012-13 |
100 |
|
|
200 |
|
|
| 119 |
132 kV S/C
Jhunjhunu (220kV GSS) - Malsisar line with 132 kV GSS
at Malsisar (Jhunjhunu) |
LR,VR |
30 |
25 |
1788.21 |
2012-13 |
100 |
|
|
200 |
|
|
| 120 |
LILO of 132
kV line Laxmangarh-Fatehpur line with 132 kV GSS at Antroli (Sikar) |
LC,LR,VR |
24 |
25 |
1650.82 |
2012-13 |
100 |
|
|
200 |
|
|
| 121 |
LILO of 132
kV Bhilwara-Hamirgarh line with 132 kV GSS at RIICO, Bhilwara (Bhilwara) |
LC,LR |
18 |
25 |
1576.04 |
2012-13 |
100 |
|
|
200 |
|
|
| 122 |
132 kV S/C
Beegod- Kachola line with 132 kV GSS at Kachola (Bhilwara) |
LC,LR,VR |
20 |
25 |
1642.71 |
2012-13 |
100 |
|
|
200 |
|
|
| 123 |
132 kV S/C
Deoli-Jahajpur line with 132 kV GSS at Jahajpur (Bhilwara) |
LC,LR,VR |
20 |
25 |
1642.71 |
2012-13 |
100 |
|
|
200 |
|
|
| 124 |
132 kV S/C
Sawa-Mangrol line with 132 kV GSS at Mangrol (Chittorgarh) |
LC,LR,VR |
18 |
25 |
1613.61 |
2012-13 |
100 |
|
|
200 |
|
|
| 125 |
132 kV S/C
Ajoliya-ka-khera-Bassi line with 132 kV GSS at Bassi (Chittorgarh) |
LC,LR,VR |
18 |
25 |
1613.61 |
2012-13 |
100 |
|
|
200 |
|
|
| D. |
132 kV New Schemes (To be identified
) |
|
|
|
|
|
|
|
|
1500 |
|
|
| |
IV. TOTAL (132KV) |
|
|
|
|
|
44270 |
495 |
475 |
44550 |
1020 |
1100 |
| |
TARGET 132 kV - WORKING |
|
|
|
|
|
|
495 |
475/17 |
|
1020 |
1100/40 |
| |
- ACHIEVEABLE |
|
|
|
|
|
|
350 |
425/15 |
|
500 |
550/20 |
| V |
Energy Meters
(Interface Metering) |
Mtg. |
|
|
|
|
70 |
|
|
|
|
|
| VI |
Capacitor banks
(MVAR) |
Cap. |
|
|
|
|
600 |
150 MVAR |
|
600 |
|
150MVAR |
| VII |
Augmentation (EAP & Plan)/(Upgradation) |
Aug. |
|
|
|
|
|
|
|
|
|
|
| |
i. Transformers
capacity (MVA) |
|
|
|
|
|
|
|
750 MVA |
|
|
1200MVA |
| |
ii. 400/220/132/33kV
Feeder bays, Transformer bays, Bus-coupler bays etc. |
|
|
|
|
|
|
|
|
|
|
|
| |
iii. 33kV line
bays as per requirement of Discoms |
|
|
|
|
|
|
|
|
|
|
|
| |
iv. Other works
approved under Augnentation |
|
|
|
|
|
|
|
|
|
|
|
| |
(A) Jaipur
Zone |
|
|
|
|
|
9000 |
|
|
7000 |
|
|
| |
(B) Jodhpur
Zone |
|
|
|
|
|
8000 |
|
|
7000 |
|
|
| |
(C) Ajmer Zone |
|
|
|
|
|
8000 |
|
|
7000 |
|
|
| VIII |
Automation/
SCADA solutions, RTU's/ BCU's, related primary equipments upgradations,
communication interfaces/ channels (under ULDC, up gradation of existing
S/S) & setting up of Sub control centre at CDCC Jaipur |
SCADA / SLDC |
|
|
|
|
650 |
|
|
4500 |
|
|
| IX |
Utility Software,
IT Software, Other Allied Software, Hardware Equipments (Upgradation / New) |
|
|
|
|
|
30 |
|
|
50 |
|
|
| X |
Capital cost
on IT/non-IT goods for 'Integrated MIS & Computerisation in RVPN |
|
|
|
|
|
450 |
|
|
50 |
|
|
| XI |
Purchase of
IT hardwares, custom software, non IT items, computer furniture, net working
items and broad band connectivity required under IMIS Project. |
|
|
|
|
|
300 |
|
|
100 |
|
|
| XII |
RMU of equipments
& protection schemes of RVPN (Scheme -II) |
|
|
|
|
|
500 |
|
|
2500 |
|
|
| XIII |
Air Conditioning
of Control Rooms of 220kV GSS |
|
|
|
|
|
530 |
|
|
260 |
|
|
| |
TOTAL (V TO
XIII) |
|
|
|
|
|
28130 |
|
|
29060 |
|
|
| |
TOTAL OF TRANSMISSION
WORKS (I TO XIII) |
|
|
|
1081614.10 |
|
153000 |
|
|
253000 |
|
|
| |
|
Details of Provision : |
Plan Works |
121300 |
|
253000 |
|
| |
|
|
Outside Plan works |
31700 |
|
0 |
|
| |
Abbreviation Used :- |
|
TOTAL |
153000 |
|
253000 |
|
| |
VR : Voltage Regulation
Improvement Scheme. |
BPTS : Bulk
Power Transfer Scheme. |
ES : Evacuation Sysstem
Scheme. |
|
|
|
|
| |
LC : Load Catering
Scheme. |
Mtg. : Metering |
LR : Loss Reduction. |
|
|
|
|
| |
SS : System Strengthening
Scheme. |
Aug. : Augmentation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|