Annexure- A 
Transmission -  Details of  Plan Provisions & Physical Targets for Annual Plan 2009-10 (Revised)
  Rs. in lacs
Annexure- A 
Transmission -  Details of  Plan Provisions & Physical Targets for Annual Plan 2009-10 (Revised) & Annual Plan 2010-11 (Proposed)
      Rs. in lakhs
S.No. Scheme Category Line Length                      (Ckt. kM) Capacity                               (in MVA) Estimated Cost        Working Target /    Dt. of Comm. Annual Plan 2009-10 (Revised) Annual Plan 2010-11 (Proposed)
Provision Physical Targets Provision Physical Targets
Proposed Proposed
(Plan+Outside Plan) Ckt Km. MVA (Plan) Ckt Km. MVA
I  765kV SCHEMES                      
A NEW START SCHEMES                      
  Composite  Power  Evacuation System {Chhabra Super Critical TPS (2x660MW) & Kalisindh TPS (2x600 MW)}                      
1 MVA, 765/400 kV GSS at Phagi(Jaipur South) alongwith 2 sets of 765kV, 3x80 MVAR (single phase) Line Reactors and 400kV, 1x125 MVAR Bus Reactor at Phagi (Jaipur South)  ES   2x1500 83285.06 2013-14 1500     40000    
2 400/765 kV GSS at Anta(Baran) Pooling Station alongwith 2 sets of 765kV, 3x80 MVAR (single phase) Line Reactors. ES   2x1500 50463.53 2013-14        
3 765 kV,2 X S/C Anta- Phagi(Jaipur South)  ES 450   68161.38 2011-12        
  I  Total (765kV)           1500     40000    
II  400kV SCHEMES                      
A. ON GOING SCHEMES                      
  Normal Development Works                      
1 Ratangarh - Merta link line including shunt reactors and allied equipments at Ratangarh & Merta BPTS,LR,BVP 181   8890.00 9.5.08 1100     100    
2 400 kV S/C Jodhpur - Merta line (Second ckt.)   98   8332.12 2010-11 4300     1500 98  
  DHOLPUR GTPS Evacuation System (Phase-I)                      
3 400kV S/C GTPS Dholpur-Heerapura line with bay equipments including shunt reactors and allied equipments at Heerapura ES 295   10319.17 3.2.08 1550     550    
  Normal Development Works                      
  CHHABRA TPS Evacuation System(Stage I) (Phase I)                      
4 400 kV D/C Chhabra TPS - Dahra line ES 261  
71682.46
13.2.09
9700
   
4500
   
5 400kV S/C Dahra - Bhilwara line(10 kM D/C span at Bhilwara end) with 400 kV GSS at Bhilwara (with 50 MVAR line reactor at Bhilwara) ES 186 315 2009-10 186 315    
6 400kV S/C Chhabra - Hindaun line(400 kV D/C span length of 11.282 kM.at Hindaun end and D/C span length of 25.5 kM at Chhabra end) with 400 kV GSS at Hindaun (with 50 MVAR line reactor at Hindaun) ES 342 315 2009-10/ 2010-11 342     315
7 LILO of 400kV Dholpur CCGT- Heerapura line at 400kV S/S Hindaun (with one 2 kM D/C length at 400 kV GSS Hindaun end) ES 9   25.11.09 9      
  Evacuation of KTPS (Unit-VII)                      
8  Interconnecting line 400 kV D/C KTPS -Kota (PG)  on twin moose conductor (to be charged on 220 kV) ES 13   915.75 2009-10 Incl. in S.No. 4 13   Incl. in S.No. 4    
  STPS Evacuation System (Unit-6)                       
9 400kV S/C STPS - Bikaner line with 400 kV S/S at Bikaner (with Switchable reactor) ES 162 315 19039.40 2009-10 2300 162 315 1300    
  RAJ WEST LTPS Evacuation System (Phase-II)                      
10 400 kV D/C Raj West - Jodhpur line and 400 kV line bays at Jodhpur with Reactor on each line ES 418   40365.13 2010-11
8000
   
2500
418  
11 400 kV D/C Raj West - Barmer line with 400 kV bay at Barmer ES 31   3308.11 2009-10 31      
  WIND POWER Evacuation in Jaisalmer/Barmer area (Phase - I)                      
12 400 kV S/C Akal (Jaisalmer) - Jodhpur line (10 kM D/C span length at both ends)(charged on 220 kV) ES 250   20156.15 2010-11
4800
   
1200
250  
13 400 kV S/C Akal(Jaisalmer) - Barmer line(10 kM D/C span length at both ends) (charged on 220 kV) ES 143   12191.00 2009-10 143      
  WIND POWER Evacuation in Jaisalmer/Barmer area (Phase - II)                      
14 400 kV GSS at Akal(Jaisalmer) with 1x50 MVAR line Reactor & 1x50 MVAR Bus Reactor ES   2x315 10712.74 2010-11 8000     5000   315
15 400 kV GSS at Barmer ES   315 6093.23 2009-10   315    
16 1 No. 400 kV bay with line Reactor at 400 kV GSS Jodhpur ES     1596.44 2010-11        
B. NEW START SCHEMES                      
  Composite   Evacuation System [Chhabra Super Critical TPS (2x660MW) and Kalisindh TPS (2x600 MW)]                      
17 400/220 kV GSS at Ajmer ES   2x315 12334.01 2012-13 1000     7500    
18 Terminal 400 kV Bays at existing 400 kV Substation at Heerapura ES     996.09 2011-12        
19 400 kV D/C (Quad Moose) Kalisindh TPS -Anta(Baran) Pooling Station Line (For Kalisingdh TPS ) ES 200 18948.83 2011-12     7000    
20 400 kV D/C (Quad Moose) Chhabra TPS - Anta(Baran) Pooling Station Line (For Chhabra TPS ) ES 260 24632.16 2011-12        
21 400 kV D/C (Twin Moose) Phagi (Jaipur South-765 kV ) - Ajmer Line  ES 250 11603.74 2011-12        
22 400 kV D/C (Twin Moose) Phagi (Jaipur South-765 kV ) - Heerapura Line ES 80 3716.19 2012-13        
  Power Evacuation of Banswara Super Critical TPS                       
23 400/220 kV GSS at Udaipur alongwith 400kV, 1x80 MVAR Bus Reactor,  2x50MVAR Line Reactors at Udaipur end of 400kV D/C Banswara TPS-Udaipur  line and 2x50MVAR Line Reactors at Udaipur end of 400kV D/C Udaipur-Jodhpur (New) line. ES - 2x315 15214.3 2013-14       27500    
24 400/220 kV GSS at Jodhpur (New) alongwith 400kV, 1x80 MVAR Bus Reactor at Jodhpur (New), and 2x50MVAR Line Reactors at Jodhpur end of 400kV D/C Udaipur-Jodhpur(New) line.  ES - 2x315 14790.96 2013-14          
25 400/220 kV GSS at Chittorgarh alongwith 400kV, 1x80 MVAR Bus Reactor, and 2x50MVAR Line Reactors at Chittorgarh end of 400kV D/C Banswara TPS-Chittorgarh line.  ES - 2x315 13834.05 2014-15          
26 Terminal 400 kV Bays at existing 400kV Substation Bhilwara ES -   2440.86 2013-14          
  400kV  Interconnecting Lines : ES                  
27 400 kV D/C Banswara TPS- Udaipur (Quad Moose) Line  ES 320   30315.48 2013-14          
28 400 kV D/C Udaipur- Jodhpur (New) (Twin Moose Line) ES 490   22739.09 2013-14          
29 400 kV D/C Banswara TPS- Chittorgarh (Quad Moose) Line ES 360   34104.37 2014-15          
30 400 kV D/C Chittorgarh-Bhilwara (Twin Moose) Line ES 100   4644.14 2014-15          
31 400 kV D/C Bhilwara-Ajmer (Twin Moose) Line ES 300   13923.6 2014-15          
32 400 kV inter-connections at 400/220 kV GSS at Jodhpur(New) by LILO of nearby 400 kV S/C lines (20 kms, 2xD/C) ES 80   3716.19 2013-14          
  Power Evacuation Scheme of Suratgarh Super Critical TPS                       
33 400/220 kV GSS at Babai (Jhunjhunu) alongwith 400kV, 1x80 MVAR Bus Reactor and 2x80MVAR Line Reactors at Babai end of 400kV D/C Suratgarh TPS-Babai (Jhunjhunu) line.  ES - 2x315 14388.31 2012-13 1000     22500    
34 Terminal 400 kV Bays at existing 400 kV Substation Bikaner (with 400kV, 1x50 MVAR Shunt Line Reactor at Bikaner end of 400kV S/C Bikaner-Merta line.) ES -   2760.19 2012-13        
35 Terminal 400 kV Bay at existing 400 kV Substation Mertacity with 400kV, 1x50 MVAR Shunt Line Reactor at Merta end of 400kV S/C Bikaner-Merta line. ES -   1387.99 2012-13        
36 400/220 kV GSS at Jaipur (North) ES - 2x315 10112.39 2012-13        
  400kV  Interconnecting Lines :   -              
37 400 kV D/C Suratgarh TPS- Babai (Jhunjhunu)(Quad Moose) Line  ES 460 43576.58 2012-13        
38 400 kV D/C Babai (Jhunjhunu)- Jaipur (North) (Twin Moose) Line ES 260 12067.71 2012-13        
39 400 kV D/C Suratgarh TPS- Bikaner (Twin Moose) Line ES 340 15779.49 2012-13        
40 400 kV S/C Bikaner- Merta (Twin Moose) Line ES 200 11899.74 2012-13        
   II      TOTAL ( 400kV )           41750 886 945 81150 766 630
   TARGET 400 kV       - WORKING             886 945/3   766 630/2
                                   - ACHIVEABLE             500 945/3   750 630/2
III  220kV SCHEMES                      
A. ON GOING WORKS        
         
. GIRAL LTPS Evacuation System (Phase-I)       
 
         
1 220kV 2X S/C Giral LTPS-Barmer lines ES 67   3953.61 I ckt 31.03.06         II ckt 1.10.09 400 35        
2 LILO  of 220kV Amarsagar-Barmer line (one ckt. LILO only) to Giral LTPS  ES 10            
3 i) 220kV S/C Barmer-Dhorimanna line with 220kV S/S at Dhorimanna ES 72 100 27.03.07          
  ii) 220 kV S/C Dhorimanna - Bhinmal line ES 92  
5.1.09
         
  Normal Development Works                      
4 220 kV S/C Bhiwadi(400 kV PGCIL) - Neemrana line with 220 GSS at Neemrana (Alwar) (Financed by NCRPB) LC,LR 52 100 3398.90 21.9.08 150     50    
5 LILO of one ckt. of 220 kV D/C Bassi-Heerapura line at Indira Gandhi Nagar (Jagatpura ) with 220 kV Hybrid GSS at Indira Gandhi Nagar (Turnkey) LC 18 2x100 6398.70 2010-11 3500     2700 18 100
6 220kV S/C line Dhorimanna - Sanchore with 220kV S/S at Sanchore (Jalore) for Narmada Canal Project ( Line-Turnkey) LC 64 100 3199.88 2010-11 1200     1200 64 100
  Interconnecting Lines                      
7  Interconnecting line 220 kV S/C Kankroli(PG) - Debari  LC,SS 63   1568.75 6.7.09 350 63        
8 Opening of existing 220 kV Kota-Bhilwara (Ckt.No.1) and connecting its one end to 400 kV Kota(PG) and another end to Kota-Jaipur (3rd Ckt) outside the 220 kV Sakatpura GSS (LILO) SS 11   40.49 2010-11       40 11  
  GIRAL LTPS Evacuation System (Phase-II)                      
9 220 kV S/C Giral LTPS - Balotra  ES 103   1643.09 26.11.09 700 103        
  Barsingsar LTPS Evacuation System                       
10 220kV Barsingsar - Phalodi line (Turnkey) ES 140   3083.00 2010-11 1200     1200 140  
  CHHABRA TPS Evacuation System (Stage-I, Phase-I)                      
11 220kV S/C Chhabra TPS (400kV GSS RVUN) - Jhalawar (220kV GSS) line ES  100  
9193.56
2010-11 3500     1000 100  
12 LILO of  220kV S/C Bhilwara - Pali line at 400 kV S/S Bhilwara ES 10   19.8.09 10      
13 LILO of 220kV Bhilwara - Bali line at 400 kV S/S Bhilwara ES 6   19.8.09 6      
14 220kV D/C Hindaun (400kV) - Hindaun (220kV) line ES 16   9.9.09 16      
15 220 kV S/C Hindaun (400 kV GSS) - Mandawar line ES 46   2009-10 46      
16 220 kV S/C Chhabra - Baran - Dahra line with 220 kV GSS at Baran ES 138 100 26.05.09 138 100    
  STPS Evacuation System (Unit-6)                       
17 LILO of 220 kV S/C Bikaner - Sridungargarh line at 400 kV GSS at Bikaner ES 2   Incl. in 400kV scheme 2009-10
700
2  
200
   
18 LILO of 220 kV S/C Bikaner - Nagaur line at 400 kV GSS Bikaner ES 40   2009-10 40      
19 220 kV S/C STPS Suratgarh -Bhadra line with S/S at Bhadra ( Hanumangarh) (line-Turnkey) ES 114 100 3980.10 23.04.09 600   100 50    
20 220 kV S/C line to connect 400 kV STPS - Bikaner line near STPS with STPS end of unutilised 220 kV STPS - Suratgarh line  ES 3   109.00 23.9.09 100 3   -    
  Normal Development Works                      
21 LILO of 220 kV S/C Heerapura - Kukas line at VKIA with 220 kV S/S at VKIA LC,SS 2 100 2698.90 12.08.08 300     -    
22 LILO of 220 kV Ajmer - Phulera line at Kishangarh (Ajmer) with 220 kV GSS at Kishangarh LC,SS 0.23 100 2490.40 12.08.08 300     -    
23 220 kV S/C Merta - Makrana -  Kuchaman line SS 115   3067.90 2009-10 1100 108   100    
24 LILO 220 kV D/C Heerapura - Reengus line ( one ckt. LILO ) to Renwal with 220 kV S/S at Renwal (Jaipur) LC,LR 49
100
2709.76 28.05.09 1200 49 100 100    
25 (i) LILO of II ckt. of 220 kV D/C Bhiwadi (RVPN) - Alwar line with 220 kV GSS at Khushkhera  LC,LR 5 2x100 3263.58 3.1.09 500     400    
  (ii) 220 kV S/C Bhiwadi (PG) - Bhiwadi (RVPN) line   10   2010-11     10  
26 Stringing of 2nd ckt. of 220 kV Banswara - Debari line from Banswara to Salumber with its connectivity to 132 kV GSS Salumber by laying 5 kM 220 kV D/C line (to be charged on 132 kV) SS 87   1253.00 18.8.09 500 87        
  RAJ WEST LTPS Evacuation System (Phase - I)                      
27 220 kV D/C RajWest - Barmer line (with two 220 kV bays at Barmer) ES 27   1028.81 20.3.09 50          
28 220 kV S/C RajWest - Dhorimanna line (with one 220 kV bay at Dhorimanna end) (Turnkey) ES 90   2318.68 2010-11 1000     900 90  
  WIND POWER Evacuation in Jaisalmer/Barmer area (Phase - I)                      
29 LILO of both the circuits of 220kV D/C Amarsagar-Barmer lines (17kM D/C each) upto proposed 400kV Akal (Jaisalmer) GSS  ES 78   1317.90 2010-11 700     2000 78  
30 220kV D/C lines (3 circuits of 5kM D/C each) in approach span at proposed 400kV Akal (Jaisalmer) GSS and 8 nos. 220 kV bays at 400 kV Akal(Jaisalmer) ES 30   1541.55 2010-11   30
  Normal Development Works                      
31 LILO of 220 kV Duni-Heerapura line to SEZ -I with 220 kV GSS SEZ-I at Mahindra's SEZ, Jaipur (Phase - I) LC 15 100 2978.49 25.11.09 1850 15 100 200    
32 220 kV S/C line from 220kV Bali GSS to connect with 220kV Pindwara line  SS 3   321.54 2009-10 150 3   100    
33 220 kV S/C Kankroli (PG)-Kankroli (RVPN) line  SS 8   265.87 2009-10 200 8   50    
34 Jaipur City EHV network strengthening scheme-1                      
a 220kV, 2x160 MVA capacity GIS Substation at Mansarovar (Jaipur) alongwith associated lines and allied works       
13428.94
2010-11 100     7500    
i. 220 kV GIS Substation at existing 132 kV Substation at Mansarovar (Jaipur) SS   2x160         160
ii. Up-gradation of existing 132 kV D/C Line to 220 kV D/C Lines Between 220 kV Sanganer to 220 kV Mansarovar (Proposed) SS 19         19  
iii. 2 Nos. 220 kV Terminal Bays at 220 kV Substation at Sanganer SS              
iv. 220 kV S/C Tapping Line on Tubular Pole/Narrow base  Tower (1.5 Km), 220 kV D/C Composite Portion on Tubular Pole/ Narrow base Tower  (2 Km) by conversion of existing 132 kV S/C Heerapura-Sanganer Line & 220 kV XLPE Cable S/C (2.5 Km) from Tapping Point  SS 6         6  
v. 1 Nos. 220 kV Terminal Bays at 400 or 220 kV Substation at Heerapura SS              
vi. Up-grading and Up-rating of existing 132 kV S/C Line to 132 kV D/C on Tubular Poles between existing 132 kV GSS Mansarovar and 132 kV GSS Chambal  and associated terminal bays and strengthening SS 7         7  
vii. 132 kV Terminal Bay at existing 132 kV Substation at Chambal SS              
b 220kV GIS Substation at Nallah Power House (Jaipur) alongwith associated lines and allied works        8289.37 2010-11 100     4500    
i. 220 kV GIS substation at existing 132 kV Nallah Power House, Jaipur SS   2x160         160
ii. Up-gradation of existing 132 kV (S/C & D/C Sections) Line to 220 kV D/C Line Between 220 kV Heerapura to 220 kV Nallah Power House (Proposed) SS 18         18  
iii. 2 Nos. 220 kV Terminal Bays at 400 kV Heerapura/ 220 kV Substation at Heerapura SS              
iv. Up-rating & Refurbishment of 132 kV S/C Line between existing 220 kV Heerapura to 132 kV Chambal and associated strengthening of terminal bays. SS 7         7  
c Up-gradation of existing 132 kV Line      
789.51
2010-11 300     450    
i. Up-gradation of existing 132 kV D/C Line to 220 kV D/C Lines (to be charged on 132 kV for present) between 132 kV Kunda-Ki- Dhani to 132 kV Purana Ghat SS 20       20  
35 LILO of 220kV S/C Chhabra TPS-Baran-Dahra line with 220kV GSS at Kawai (Baran) ES 2 100 2019.83 9.6.08 100          
36  LILO of  220 kV S/C Bassi-Phulera line with 220kV GSS at Bagru I/A (Jaipur)  LC,LR 9 100 3347.51 2009-10 2500 9 100 250    
37 LILO of  220kV S/C Jodhpur- Balotra line  with 220kV GSS at Boranada I/A (Jodhpur) LC,LR 2 100 3032.22 2009-10 2000 2 100 250    
38 LILO of 220 kV Debari - Banswara line for 220 kV Madri with 220 kV GSS at Madri (Udaipur) LC,LR 32 200 3412.72 2010-11 1200     1000 32 100
39 LILO of one ckt. of existing 220 kV D/C KTPS - Beawar line at proposed 220 kV GSS Gulabpura LC,LR 20 100 2436.92 2010-11 800     1200 20 100
40 i)LILO of proposed 220 kV S/C Badarpur - Alwar line at proposed 220 kV GSS MIA Alwar LC,LR 10 100
3428.49
2010-11 1200     1500 10 100
  ii)220 kV S/C Mandawar -AlwarMIA line (Turnkey)   56   2010-11     56  
41 i)220 kV Khushkhera - Neemrana line ( Turnkey) SS 56  
4000.54
2010-11 1000     2200 56  
  ii)220 kV D/C Neemrana - Kotputli line (Turnkey) SS 100   2010-11     100  
42 LILO of one ckt. of existing 220 kV D/C Bhiwadi - Alwar line at proposed 220 kV GSS Kishangarh Bas with 220 kV GSS at Kishangarh Bas LC,LR 4 100 2123.25 2010-11 700     1200 4 100
43 (i)  LILO of 220 kV S/C Hissar - Khetri line with 220 kV GSS at Chirawa (Line-Turnkey) LC,SS 40 100
5928.77
2010-11 1000     3000 40 100
44 (ii)  220 kV S/C Bhadra - Chirawa line (Turnkey) SS 125   2010-11     125  
45 LILO of 220 kV S/C Sikar - Kuchamancity line at proposed 220 KV GSS Dhod with 220 kZV GSS at Dhod (Sikar) LC,LR 8 100 2905.17 2010-11 1200     1200 8 100
46 LILO of 220 kV S/C Bikaner - Nagaur line at proposed 220 kV GSS Nokha with 220 kV GSS at Nokha ( Bikaner ) LC,LR 10 100 3414.39 2010-11 1400     1400 10 100
B. NEW START SCHEMES                      
47 Jaipur EHV network strengthening scheme-II SS                    
  Phase -I                      
(i) 220kV GIS Substation at existing 132 kV Sub station at Puranaghat  SS  
160
9892.30 2010-11
500
   
5000
  160
(ii) 2 Nos 220kV Terminal Bays( one diameter) at 220 kV Sub station at Indira Gandhi Nagar ( Jagatpura)                  
(iii) 2 Nos 220kV Terminal Bays at 220 kV Sub station Kukas                  
(iv) Upgradation of 132 kV S/C line to 220 kV D/C lines between 220kV Indira Gandhi Nagar (Jagatpura) & 220kV Puranaghat SS 8           8  
(v) New 220 kV D/C lines between 220 kV Kukas to Kunda Ki Dhani (for connecting to already approved 220 kV KK Dhani to Purana Ghat line) SS 8           8  
(vi) LILO of one ckt of 220kV D/C Kukas - Indira Gandhi Nagar Line at Puranaghat SS 1           1  
(vii) Upgradation of 132 kV D/C line to 220 kV D/C lines (to be charged on 132kV) between  220kV Puranaghat (Proposed)  to 132 kV Jawahar Nagar SS 14           14  
  Phase -II                  
(viii) 2nd Transformer at 220kV GSS at Puranaghat SS   160   2010-11       160
48 Interconnections for 400 kV GSS Deedwana (RVPN Scope)                       
i. LILO of proposed 220 kV S/C Kuchamancity - Dhod line at proposed 400 kV GSS Deedwana  SS 80   1849.58 2011-12 50     500    
49 Interconnections for 400 kV GSS Alwar (RVPN Scope)                       
i. LILO of existing 220 kV S/C Dausa-Alwar line at proposed 400 kV GSS Alwar SS 20   673.31 2011-12 50     400    
ii. LILO of 220 kV S/C Mandawar - Alwar (MIA) line at proposed 400 kV Alwar GSS  SS 20   673.31 2011-12        
50 220 kV Interconnections at PGCIL's 400/220 kV GSS at Bhinmal                    
i. LILO of 220 kV S/C Sirohi-Bhinmal line at PGCIL;s 400/220 kV Bhinmal GSS SS 10   2486.33 2011-12 150     700    
ii. 220 kV S/C line from PGCIL's 400/220 kV Bhinmal GSS to RVPN's 220 kV GSS Bhinmal(covered in Sr. no. iii below) SS     2011-12        
iii. 220 kV S/C line from PGCIL's 400/220 kV Bhinmal GSS to RVPN's 220 kV GSS Sanchore(6.8 kM D/C at 400 kV Bhinmal end & 4 kM D/C at 220 kV Sanchore end) SS 82   2011-12        
51 220 kV D/C line to connect the LILO of 220 kV S/C Heerapura-Khetri line(second ckt.) to LILO of one ckt. of 220 kV D/C Neemrana- Kotputli line SS 100   2004.65 2011-12 150     600    
  Composite  Power  Evacuation System [Chhabra Super Critical TPS (2x660MW) and Kalisindh TPS (2x600 MW)]                      
52 LILO 220kV Ajmer-Beawer Line at 400kV Ajmer GSS ES 20   408.5 2011-12 200     500    
53 LILO 220kV Ajmer-Kishangarh Line at 400kV Ajmer GSS ES 20   408.5 2011-12        
54 For Kalisindh TPS (2x600MW): 220kV D/C Kalisindh-Jhalawar Line  ES 20   649.52 2011-12        
  Power Evacuation System of Banswara Super Critical TPS (2x660 MW)                      
   220kV Interconnecting Lines :                 2000    
55 220 kV Interconnections at 400/220 kV GSS Udaipur ES 50   2043.68 2013-14          
56 220 kV Interconnections at 400/220 kV GSS Chittorgarh ES 50   2043.68 2013-14          
57 220 kV Interconnections at 400/220 kV GSS Jodhpur (New) ES 50   2043.68 2013-14          
58 220 kV D/C Banswara TPS- Banswara (220 kV GSS) Line ES 20   409.62 2013-14          
  Power Evacuation System of Suratgarh Super Critical TPS                       
   220kV Interconnecting Lines :                      
59 220 kV Interconnections at 400/ 220 kV GSS Babai(Jhunjhunu) ES 50   2044.79 2011-12       1000    
60 220 kV Terminal Bays at varios 400/220 kV Substations (6 No.) ES     1078.12 2011-12          
61 220 kV Interconnections at 400/ 220 kV GSS at Jaipur (North) ES 60   2453.3 2011-12          
  Power Evacuation System of  Ramgarh GTPS (Stage-III) :                      
62 220/132kV, 2x100 MVA GSS at Dechu (New location) ES 2x100   4307.69 2011-12 800     4800    
63 220 kV D/C Ramgarh GTPP-Dechu line  ES 420   8655.07 2011-12        
64 220kV S/C Dechu -Tinwari line  ES 80   1931.89 2011-12        
65 220kV S/C Dechu -Phalodi line  ES 40   967.05 2011-12        
C Any other New 400 kV & 220 kV Scheme (to be identified)           500     4000    
D 220 kV Bus Bar Protection Scheme            100     2000    
E Carried Over Liabilities (Civil works & Bal.Elect. Works - 220kV & 400kV)of  Sub Stations & Lines Commissioned in last 3 years only           1000     800    
  III. TOTAL (220kV )           37350 743 600 58240 1110 1540
   TARGET 220 kV       - WORKING             743 600/6   1110 1540/13
                                   - ACHIVEABLE             500 500/5   600 800/8
                         
IV 132kV  SCHEMES                      
A. Carried Over Liabilities for Civil works & balance Electrical works for  S/S & Lines commissioned  in last 3 years           1000     800    
B. ON GOING SCHEMES                      
  Normal Development Schemes        
 
           
1 LILO of 132kV Barmer - Gadra Road line to 220kV Barmer VR,LR 15     2009-10 150 15        
2 Sheo - Undoo line with S/S at Undoo VR,LR 48 25 1099.07 1.12.08 100     -    
3 Sawaimadhopur-Bhadoti line with S/S at Bhadoti (Sawaimadhopur) Lline -Turnkey) VR,LR, LC 30 25 1042.30 2009-10 400 30 25 100    
4 Sujangarh(220kV)-Parewara line with S/S at Parewara (Churu)  (Line -Turnkey) VR,LR, LC 37 25 1108.70 14.2.09 300     -    
5 S/C Dechu - Kalau line  with S/S at Kalau (Jodhpur) (Turnkey) VR,LR, LC 27 25 1042.30 23.10.08 150     -    
6 Gharsana-Khajuwala line with S/S at Khajuwala (Bikaner) (Turnkey) VR,LC 62 25 1429.70 6.10.08 150     -    
7 132 kV GSS at SMS Stadium (Hybrid S/S) (Turnkey) LC  - 2x50 2850.00 31.3.09 2000     200    
8 Interconnection of 220kV Sridungargarh                      
  (i) 132 kV line from 220 kV Sri Dungargarh - 132 kV GSS Badnu  LC 28   - 27.6.09 100 28   100    
9 132 kV Jhalawar (220 kV GSS) - Bhawani Mandi (via Kanwari) (Jhalawar-Kanwari section)(Bhawanimandi - Kanwari section completed in 2008-09) SS,LR 35 - 618.10 27.7.09 200 21        
10 LILO of 132kV Banswara-Pratapgarh line to Dalot with 132kV S/S at Dalot (Pratapgarh) VR,LR, LC 47 25 1396.80 25.04.09 250 47 25 50    
11 (i) LILO of existing 132 kV S/C Puranaghat-Sitapura line at 220 kV Indira Gandhi Nagar GSS  LC 2   Incl. in 220kV scheme 2010-11 Incl. in 220kV scheme     Incl. in 220kV scheme 2  
  (ii) 132/33kV transformer at 220 kV Indira Gandhi Nagar GSS LC   2x50 2010-11       50
12 132kV GIS Substation at PWD Bunglow, Station Road, Jaipur ( at premises of existing TCC office) ( Turnkey) LC     11682.70 2010-11 5000     2000    
  (i) underground cable from 132kV GSS Nallah Power House - PWD Bunglow   10           10  
  (ii) 132/33kV conventional type transformer with 132kV & 33kV Gas Insulated Modules     2x50           50
  (iii) 2 Nos 132kV extension bays at 132kV GSS Nallah Power House                  
  Schemes for Narmada Canal Project                      
13 132kV S/C line Sawa - Sata with 132kV S/S at Sata (Barmer) (Line -Turnkey) LC,LR 50 25 1414.80 2010-11 650     650 50 25
14 132kV S/C line Sanchore(220kV) - Galifa with 132kV S/S at Galifa (Jalore) (Line-Turnkey) LC,LR 25 25 1176.25 2010-11 550     550 25 25
15 132kV interconnection line LILO 132kV Bhadroona - Sanchore line at 220kV Sanchore ( Line -Turnkey) LC 7   Incl. in 220kV Sanchore 2010-11 Incl. in 220kV Sanchore     Incl. in 220kV Sanchore 7  
  CHHABRA TPS Evacuation System (Stage I, Phase I)                      
16 LILO of 132 kV Sangod - Baran at 220 kV GSS Baran ES 7   Incl. in 400 kV Scheme 2009-10 Incl. in 220 kV Scheme 7   Incl. in 220 kV Scheme    
17 LILO of 132 kV Anta - Baran at 220 kV GSS Baran ES 2   10.7.09 2      
  Normal Development Schemes                      
18 132 kV GSS Karauli - Sapotra line with S/S at Sapotra (Karauli) VR,LR 35 25 1136.70 4.3.09 300          
19 LILO of 132kV VKI - Vaishali Nagar line to New Jhotwara with 132kV  GIS S/S at New Jhotwara (Jaipur) (Turnkey) LC,LR 4 2x50 3973.80 2010-11 2800     1000 4 50
20 LILO of 132kV Morak - Jhalawar line to Mayla-Ramganjmandi with  S/S at Mayla-Ramganjmandi (Kota) VR,LR, LC 9 25 939.43 27.3.09 250          
21 LILO of 132kV Kota - Sangod line to Deoli with 132kV S/S at Deoli (Kota) LC,LR 4 25 897.82 15.12.08 250          
22 LILO of 132kV Kota - Sangod line to Akelgarh water works  S/S at Akelgarh Water works (Kota) LC,LR 4 25 877.02 2010-11 300     550 4 25
23 132 kV GSS Aklera - Manoharthana line  with S/S at Manoharthana (Jhalawar) VR, LC 38 25 1281.35 19.2.09 300     -    
24 132 kV S/C line from 220 kV GSS Hanumangarh - Rawatsar with S/S at Rawatsar (Hanumangarh) VR,LR, LC 40 25 1317.46 2010-11 750     350 40 25
25 LILO of 132kV Bikaner - Sri Dungargarh (220kV) line to Dulchasar with  S/S at Dulchasar  (Bikaner) LC,LR 19 25 1084.84 31.7.09 750 19 25 100    
26 132 kV S/C line from  Badnu - Jasrasar with  S/S at Jasrasar (Bikaner) (Line- Turnkey) LR,LC 28 25 1317.46 2009-10 1000 28 25 170    
27 132 kV S/C line from 220 kV GSS Sri Dungargarh -Riri with S/S at Riri (Bikaner) (Line- Turnkey) LR,LC 16 25 1088.51 2009-10 850 16 25 150    
28 132 kV S/C  Lohawat - Matora line with  S/S at Matora (Jodhpur) LR,LC 28 25 1196.95 27.11.08 250     -    
29 LILO of 132kV Bhinmal- Gudamalani line to Bagora with   S/S at Bagora (Jalore) VR,LR, LC 13 25 980.93 2009-10 350 13 25 100    
30 132 kV S/C line from 220 kV GSS Banswara - Paloda with S/S at Paloda (Banswara) (line to be commissioned) VR,LR, LC 35 25 1257.21 18.8.09 900 35 25 100    
31 132 kV S/C line from Salumber - Dhariyawad with  S/S at Dhariyawad (Pratapgarh) (Line- Turnkey) VR,LR 69 25 1546.42 2010-11 800     700 69 25
32 132 kV S/C line from 220 kV GSS Nagaur  - Jayal  with S/S at Jayal ( Nagaur) (Line- Turnkey) LC 48 25 1413.94 2009-10 1100 48 25 200    
33 i) LILO of Existing 132 kV S/C VKIA - Kukas line at 220 kV GSS VKIA LC,SS 1   Incl. in 220kV Scheme 2009-10 Incl. in 220kV Scheme 1        
  ii) Extension of Existing 132 kV S/C VKIA - Pratap Steel line upto 220 kV GSS VKIA LC,SS 4   2009-10 4      
  iii) 132/33 kV Transformers at 220 kV GSS VKIA     2x50          
34 (i) LILO of 132 kV Ajmer - Kishangarh line at 220 kV GSS Kishangarh (Ajmer) LC,SS 10   Incl. in 220kV scheme 28.11.08 Incl. in 220kV scheme          
  (ii) LILO of 132 kV Phulera-Kishangarh line at 220 kV GSS Kishangarh (Ajmer) LC,SS 24   27.6.09 24      
35 LILO of 132 kV S/C Bharatpur -Alwar line at Kumher with S/S at Kumher (Bharatpur) VR,LR 6 25 988.60 30.7.09 300 6 25 50    
36 LILO of  RPS - Mandalgarh line at Bijolia with S/S at Bijolia (Bhilwara) VR,LR 29 25 1154.10 2009-10 550 29 25 150    
37 132 kV D/C line from 220 kV SEZ-I to 132 kV SEZ-I with 132 kV GSS at SEZ-I LC 4 25 1175.82 2010-11 350     700 4 25
38 LILO 132kV Kotputli-Shahpura  line for 132 kV Paota with 132kV GSS at Paota (Jaipur) LC,LR 10 25 1173.95 2010-11 550     550 10 25
39 132kV S/C Behror - Jakharana  line with 132kV GSS at Jakharana(Alwar) ( Line- Turnkey) LC,LR 17 25 1286.50 2009-10 800 17 25 200    
40 132kV S/C  Kawai-Atru line with 132kV GSS at Atru (Baran) LC,LR 19 25 1313.72 2010-11 350     900 19 25
41 LILO 132kV Bundi-Deoli line for 132 kV Hindoli with 132kV GSS at Hindoli (Bundi) LC,LR 10 25 1173.95 2010-11 300     750 10 25
42 132kV S/C Ranoli - Khandela Mod line with 132kV GSS at Khandela Mod (Sikar) LC,LR 26 25 1409.03 2009-10 1100 26 25 250    
43 LILO 132kV Kotputli-Neem Ka Thana line for 132 kV Patan with 132kV GSS at Patan (Sikar) LC,LR 4 25 1126.39 27.04.09 600 4 25 100    
44 LILO 132kV Chittor-Hamirgarh line for 132 kV Rashmi with 132kV GSS at Rashmi (Chittorgarh) (Line- Turnkey) LC,LR 40 25 1530.64 2010-11 750     700 40 25
45 LILO 132kV RPS-Bhilwara line for 132 kV Beegod with 132kV GSS at Beegod (Bhilwara) LC,LR 2 25 1078.83 23.3.09 600          
46 132kV S/C Madri-Dakan Kotda (Transport Nagar) line with 132kV GSS at Dakan Kotda (Transport Nagar), Udaipur LC 10 25 1191.19 2010-11 300     750 10 25
47 132kV Saradhna-Pushkar Road- MDS University with 132kV GSS at Pushkar Road (Ajmer) (Line- Turnkey) LC,LR 29 25 1613.64 2010-11 850     700 29 25
48 132kV S/C Jhunjhunu (220kV)- Bherunda Kalan- Sultana with 132kV GSS at  Bherunda Kalan (Jhunjhunu) LC 34 25 1681.71 2009-10 1250 34 25 150    
49 LILO 132kV Jalore-Siwana line for 132 kV Mandawala with 132kV GSS at  Mandawala (Jalore)  LC,LR 3 25 1150.17 3.09.09 700 3 25 150    
50 LILO 132kV Jodhpur-Baori line for 132 kV Jhalamand with 132kV GSS at Jalamand (Jodhpur) LC,LR 4 25 1078.83 2010-11 150     700 4 25
51 LILO 132kV Pali-Falna line for 132 kV Tagore Nagar  with 132kV GSS at Tagore Nagar (Pali) LC 4 25 1102.61 2010-11 500     500 4 25
52 LILO 132kV Bhiwadi (RVPN)- Kushkhera line for 132 kV Chopanki I/A with 132kV GSS at Chopanki I/A, (Alwar) LC,LR 20 25 1197.73 2009-10 800 20 25 150    
53 LILO 132kV Kotputli- Behror line for 132 kV Keshwana I/A with 132kV GSS at Keshwana I/A (Jaipur) LC,LR 4 25 1173.95 2010-11 400     650 4 25
54 LILO 132kV Kishangarh- Malpura line for 132 kV Silora I/A with 132kV GSS at Silora I/A (Ajmer) LC,LR 13 25 1292.84 24.3.09 600          
55 (i) LILO 132 kV S/C Bhankrota-Bagru line at proposed 220kV GSS Bagru   LC,LR 7   Incl. in 220kV scheme 2009-10 Incl. in 220kV scheme 7   Incl. in 220kV scheme    
  (ii) 132kV/33kV Transformers at 220kV GSS Bagru I/A (Jaipur) LC,LR   2X25 2009-10   25    
56 132kV/33kV Transformers at 220V GSS Boranada I/A (Jodhpur) LC,LR   2X25 Incl. in 220kV scheme 2009-10 Incl. in 220kV scheme   25 Incl. in 220kV scheme    
57 132 kV S/C Dhod - Losal line (Line- Turnkey) SS 16   Incl. in 220 kV  Dhod 2010-11 Incl. in 220 kV  Dhod     Incl. in 220 kV  Dhod 16  
58 132 kV Dhod - Kachhawa line (Line- Turnkey) SS 22   Incl. in 220 kV  Dhod 2010-11 Incl. in 220 kV  Dhod     Incl. in 220 kV  Dhod 22  
59 132 kV D/C Nokha - Jasrasar line (Line- Turnkey) SS 80   Incl. in 220 kV  Nokha 2010-11 Incl. in 220 kV  Nokha     Incl. in 220 kV  Nokha 80  
60 LILO 132 kV Sikar - Udaipurwati line for 132 kV Piprali with 132 kV GSS at Piprali (Sikar) LC,LR 7 25 1207.84 30.05.09 600 7 25 100    
61 132kV S/C Buhana-Mahapalwas with 132 kV GSS at Mahapalwas (Jhunjhunu) (Line- Turnkey) LC,LR 23 25 1423.7 2010-11 250     900 23 25
62 132kV S/C Surajgarh- Dulaniya with 132 kV GSS at Dulaniya (Jhunjhunu) (Line- Turnkey) LC,LR 18 25 1355.62 2010-11 250     700 18 25
63 LILO 132kV Bhilwara-Pali line for 132 kV Karera with 132 kV GSS at Karera (Bhilwara)  VR,LR 6 25 1181.9 2010-11 300     700 6 25
64 132kV S/C Kishangarh-Roopangarh with 132 kV GSS at Roopangarh (Ajmer) LC,LR 25 25 1450.92 2010-11 350     650 25 25
65 LILO 132kV Khetri-Gudha Gorji for132 kV Nangli  with 132 kV GSS at Nangli (Jhunjhunu) LC,LR 4 25 1158.12 2010-11 100     700 4 25
66 LILO 132kV Bhilwara-Rayla line for 132 kV  Danta  with 132 kV GSS at Danta (Bhilwara) VR,LC 10 25 1229.46 2010-11 350     800 10 25
67 132kV LILO of 132 kV Nimbaheda - Sawa line for Bhadesar with 132 kV GSS at Bhadesar (Chittorgarh) VR,LC 24 25 1395.92 2010-11 400     800 24 25
68 LILO 132kV Khinwsar-Soyla line for 132 kV  Narwa with 132 kV GSS at Narwa (Hanuman Nagar) (Nagaur) LC 30 25 1467.26 2010-11 300     700 30 25
69 LILO 132kV Dhaurimanna-Sawa line for 132 kV Ranasar with 132 kV GSS at Ranasar (Barmer) LC 12 25 1253.24 2010-11 200     900 12 25
70 132kV S/C Reodar- Badgaon line with 132 kV GSS at Badgaon (Jalore) LC,LR 32 25 1546.23 2010-11 650     700 32 25
71 LILO 132kV Suratgarh-Anoopgarh line for 132 kV Sri Vijaynagar with 132 kV GSS at Sri Vijaynagar (Sriganganagar) VR,LR 30 25 1467.26 2010-11 250     900 30 25
72 132kV S/C line from 220kV Phalodi-Bap line with 132 kV GSS at Bap (Jodhpur) (Line- Turnkey) VR,LR 30 25 1519 2010-11 250     1100 30 25
73 132kV S/C Pilibanga- Guluwala line with 132 kV GSS at Guluwala (Hanumangarh) LC,LR 25 25 1450.92 2010-11 250     1000 25 25
74 132kV S/C Dechu-Sanwreej line with 132 kV GSS at Sanwreej (Jodhpur) (Line- Turnkey) LC,LR 24 25 1437.31 2010-11 250     1100 24 25
75 LILO 132kV Alwar-Mandawar line for 132 kV Pinan with 132 kV GSS Pinan (Alwar) LC,LR 6 25 1181.9 2010-11 150     800 6 25
76 132kV S/C line from 220kV Dholpur-Roopwas with 132 kV GSS at Roopwas (Bharatpur) ( Line- turnkey) VR,LR 50 25 1791.29 2010-11 300     900 50 25
77 132kV S/C Phulera-Dudu line with 132 kV GSS at Dudu (Jaipur) VR,LC 25 25 1450.92 2010-11 20     1000 25 25
78 132kV S/C Balawala-Phagi line with 132 kV GSS at Phagi  (Jaipur) VR,LC 20 25 1382.85 2010-11 400     850 20 25
79 LILO 132kV Hindaun-Gangapur line for 132 kV Baroli with 132 kV GSS at Baroli  (Sawaimadhopur) VR,LC 16 25 1300.8 2010-11 200     800 16 25
80 LILO 132kV Hingonia-Heerapura line for 132 kV Champapura with 132 kV GSS at Champapura, Kalwar Road, Jaipur (Jaipur) LC,LR 10 25 1229.46 2010-11 200     650 10 25
81 LILO 132kV Kota-Modak line for 132 kV Mandana with 132 kV GSS at Mandana Town (Kota) LC,LR,VR 16 25 1300.8 2010-11 200     750 16 25
82 LILO 132 kV Bundi-Kota line for 132 kV Talera with 132 kV GSS at Talera  (Bundi) LC,LR,VR 16 25 1300.8 2010-11 150     750 16 25
83 132kV S/C Baseri -Sarmathura line with 132 kV GSS at Sarmathura  (Dholpur) ( Line- Turnkey) VR,LR 35 25 1587.07 2010-11 250     900 35 25
84 LILO Jalore - Jeewana line at Sayla SS 4   180.9 2009-10 150 4   30    
C. NEW START SCHEMES                       
85 132kV S/C Zawarmines - Rishabdeo line  SS 35   671.02 2010-11 150     450 35  
86 132kV S/C Duni - Deoli line SS 35   671.02 2010-11 150     450 35  
  Interconnections for 400 kV GSS Deedwana (RVPN Scope)                     
87 132 kV D/C interconnecting line between proposed 400 kV Deedwana GSS and existing 132 kV Deedwana GSS  SS 20   734.64 2011-12 100     200    
  Interconnections for 220 kV GSS Nawalgarh (RVPN Scope)                     
88 LILO of existing 132 kV S/C Koodan - Nawalgarh line to proposed 220 kV Nawalgarh GSS SS 8   283.87 2011-12 200     400    
89 132 kV S/C Nawalgarh(220 kV) - Kumawas line SS 22   489.43 2011-12        
90 132 kV S/C Nawalgarh(220 kV) - Gudagorji line SS 34   653.58 2011-12        
91 132 kV S/C Nawalgarh(220 kV) - Udaipurwati line SS 30   598.86 2011-12        
  Power Evacuation System of  Ramgarh GTPS (Stage-III) :                      
92 LILO of existing 132kV S/C Dechu-Pokran line at proposed 220kV Dechu GSS ES 2   26.03 2011-12 Incl. in 220 kV scheme     Incl. in 220 kV scheme    
93 LILO of existing 132kV S/C Dechu-Phalodi line at proposed 220kV Dechu GSS ES 8   100.8 2011-12        
  Normal Development Works                      
94 LILO of 132 kV Hindaun-Todabhim line with 132 kV GSS at Daula Kunwa(Bada Khora)  (Dausa)  LC,LR,VR 1 25 1364.19 2012-13 100     200    
95 LILO of  132 kV  Kishangarh Bas-Khushkhera line with 132 kV GSS at PUR, Kotkasim(Alwar) LC,LR,VR 30 25 1725.59 2012-13 100     200    
96 LILO of 132 kV Alwar-Bansur line with 132 kV GSS at Vijay Mandir, Alwar City(Alwar) LC,LR,VR 6 25 1426.49 2012-13 100     200    
97 LILO of 132 kV  Todabhim-Sikandra line with 132 kV GSS at Sikrai(Dausa) LC,LR 6 25 1426.49 2012-13 100     200    
98 132 kV S/C Shri Mahaveerji GSS-Nangal Sherpur line with 132 kV GSS at Nangal Sherpur (Karauli) LC,LR,VR 20 25 1642.71 2012-13 100     200    
99 LILO of 132 kV  Hindaun-Todabhim line with 132 kV GSS  at Mahuwa (Dausa) LC 16 25 1551.12 2012-13 100     200    
100 LILO  of  132 kV Jamwa Ramgarh-Rajgarh line with 132 kV GSS  at Andhi (Jaipur) LR,VR 6 25 1426.49 2012-13 100     200    
101 LILO of 132kV  Heerapura-VKIA-Rampura Dabri line with 132 kV GSS  at RIICO, Sarna Doongar (Jaipur) LC,LR,VR 4 25 1401.57 2012-13 100     200    
102 132 kV  S/C Karauli -Kaila Devi line with 132 kV GSS Kaila Devi  (Karauli) LC,LR,VR 25 25 1715.46 2012-13 100     200    
103 132 kV  S/C Karauli -Mandrayal line with 132 kV GSS Mandrayal (Karauli) LR,VR 45 25 2006.46 2012-13 100     250    
104 LILO of  132 kV  Jodhpur-Bilara line with 132 kV GSS at SEZ, Kaparda (Jodhpur) LC 10 25 1476.34 2012-13 50     100    
105 LILO of 132 kV  Padampur-Sri Ganganagar line with 132 kV GSS at Telewala (Sri Ganganagar) LC,LR,VR 12 25 1501.27 2012-13 100     200    
106 132 kV S/C Momasar-Patlisar Fanta line with 132 kV GSS Patlisar Fanta (Churu) LC,LR,VR 15 25 1569.96 2012-13 100     200    
107 LILO  of  Sawa-Sata line with 132 kV GSS at Sedwa (Barmer) LC,LR,VR 4 25 1401.57 2012-13 100     200    
108 132 kV Padroo-Junameetha Khera-Sindhari line with 132 kV GSS at Junameetha Khera (Barmer) LC,LR,VR 40 25 2117.09 2012-13 100     250    
109 132 kV S/C  Sanchore ( 220kVGSS )-  Paladar line with 132 kV GSS at Paladar (Jalore) LC,LR,VR 15 25 1569.96 2012-13 100     200    
110 132 kV S/C Riri-Upani line with 132 kV GSS at Upani (Bikaner) LC,LR,VR 13 25 1540.86 2012-13 100     200    
111 132 kV S/C Sri Karanpur - Kaminpura line with 132 kV GSS at Kaminpura (Sri Ganganagar) LC,LR,VR 25 25 1715.46 2012-13 100     200    
112 LILO of  132 kV Neem Ka Thana-Khetri line with 132 kV GSS at Babai (Jhunjhunu) LC,LR,VR 10 25 1476.34 2012-13 100     200    
113 LILO of  132 kV MDSU-Bherunda line with 132 kV GSS at Pushkar (Ajmer) LC,VR 16 25 1551.12 2012-13 100     200    
114 LILO of 132 kV   Beawar-Nasirabad line with 132 kV GSS at Kharwa (Ajmer) LR,VR 10 25 1476.34 2012-13 100     200    
115 132 kV S/C  Kankroli (220kV) -Sapol line with 132 kV GSS at Sapol (Rajsamand) LC,VR 23 25 1686.36 2012-13 100     200    
116 LILO of 132 kV  Banswara-Sagwara line with 132 kV GSS at Partapur(Banswara) LC,LR,VR 22 25 1625.89 2012-13 100     200    
117 132 kV S/C  Mavli - Sanwad  line with 132 kV GSS at Sanwad (Udaipur) LC,LR,VR 20 25 1642.71 2012-13 100     200    
118 132 kV S/C  Shri Madhopur - Thoi line with 132 kV GSS at Thoi (Sikar) LC,LR,VR 21 25 1657.26 2012-13 100     200    
119 132 kV S/C  Jhunjhunu  (220kV GSS) - Malsisar line with 132 kV GSS at  Malsisar (Jhunjhunu) LR,VR 30 25 1788.21 2012-13 100     200    
120 LILO of 132 kV line Laxmangarh-Fatehpur line with 132 kV GSS at Antroli (Sikar) LC,LR,VR 24 25 1650.82 2012-13 100     200    
121 LILO of 132 kV Bhilwara-Hamirgarh line with 132 kV GSS at RIICO, Bhilwara (Bhilwara) LC,LR 18 25 1576.04 2012-13 100     200    
122 132 kV S/C Beegod- Kachola line with 132 kV GSS at Kachola (Bhilwara) LC,LR,VR 20 25 1642.71 2012-13 100     200    
123 132 kV S/C Deoli-Jahajpur line with 132 kV GSS at Jahajpur (Bhilwara) LC,LR,VR 20 25 1642.71 2012-13 100     200    
124 132 kV S/C Sawa-Mangrol line with 132 kV GSS at Mangrol (Chittorgarh) LC,LR,VR 18 25 1613.61 2012-13 100     200    
125 132 kV S/C Ajoliya-ka-khera-Bassi line with 132 kV GSS at Bassi (Chittorgarh) LC,LR,VR 18 25 1613.61 2012-13 100     200    
D. 132 kV New Schemes (To be identified )                  1500    
  IV.  TOTAL  (132KV)           44270 495 475 44550 1020 1100
   TARGET 132 kV        - WORKING             495 475/17   1020 1100/40
                                   - ACHIEVEABLE             350 425/15   500 550/20
V Energy Meters (Interface Metering) Mtg.         70          
VI Capacitor banks (MVAR) Cap.         600 150 MVAR   600   150MVAR
VII Augmentation  (EAP & Plan)/(Upgradation) Aug.                    
  i. Transformers capacity (MVA)               750 MVA     1200MVA
  ii. 400/220/132/33kV Feeder bays, Transformer bays,  Bus-coupler bays etc.                      
  iii. 33kV line bays as per requirement of Discoms                      
  iv. Other works approved under Augnentation                      
  (A) Jaipur Zone           9000     7000    
  (B) Jodhpur Zone           8000     7000    
  (C) Ajmer Zone           8000     7000    
VIII Automation/ SCADA solutions, RTU's/ BCU's, related primary equipments upgradations, communication interfaces/ channels (under ULDC, up gradation of existing S/S) & setting up of Sub control centre at CDCC Jaipur SCADA / SLDC         650     4500    
IX Utility Software, IT Software, Other Allied Software, Hardware Equipments (Upgradation / New)           30     50    
X Capital cost on IT/non-IT goods for 'Integrated MIS & Computerisation in RVPN           450     50    
XI Purchase of IT hardwares, custom software, non IT items, computer furniture, net working items and broad band connectivity required under IMIS Project.           300     100    
XII RMU of equipments & protection schemes of RVPN (Scheme -II)           500     2500    
XIII Air Conditioning of Control Rooms of 220kV GSS           530     260    
  TOTAL (V TO XIII)           28130     29060    
  TOTAL OF TRANSMISSION WORKS (I TO XIII)       1081614.10   153000     253000    
    Details of Provision : Plan Works 121300   253000  
      Outside Plan works 31700   0  
  Abbreviation Used :-   TOTAL 153000   253000  
  VR  : Voltage Regulation Improvement Scheme. BPTS  : Bulk Power Transfer Scheme. ES  : Evacuation Sysstem Scheme.        
  LC  : Load Catering Scheme. Mtg. : Metering LR  : Loss Reduction.        
  SS  : System Strengthening Scheme. Aug. : Augmentation