GENERATING PROJECTS ALREADY IN OPERATION AND CONNECTED TO THE RVPN GRID INCLUDING SHARE OF CENTRAL PROJECTS AS ON 31st March- 2007 

1 OWNED Installed Capacity (MW) Raj. Share % Firm capacity available  to Raj. (MW)
(a) HYDRO      
1 Mahi (2x25+2x45) 140.00 100.00 140.00
2 Anoopgarh (3x1.5+3x1.5) 9.00 100.00 9.00
3 Mahi-RMC(2x0.4+1x0.165) 0.97 100.00 0.97
4 Suratgarh MH (2x2) 4.00 100.00 4.00
5 MangrolL MH (3x2) 6.00 100.00 6.00
6 Pugal MH (1x1.5+1x0.65) 2.15 100.00 2.15
7 Charanwala (1x1.2) 1.20 100.00 1.20
8 Birsulpur MH (1x0.535) 0.54 100.00 0.54
SUB-TOTAL (a) 163.85 163.85
(b) THERMAL / GAS      
1 KTPS Stage.I,II,III (2x110+2x210+1x210) 850.00 100.00 850.00
2 KTPS  Stage.IV (1x195) 195.00 100.00 195.00
3 Ramgarh Gas (1x3) 3.00 100.00 3.00
4 Ramgarh Gas (1x35.5)  35.50 100.00 35.50
5 Ramgarh Gas Extn. (2x37.5)  75.00 100.00 75.00
6 Suratgarh Stage - I (2x250) 500.00 100.00 500.00
7 Suratgarh Stage - II (2x250) 500.00 100.00 500.00
8 Suratgarh Stage-III (1x250) 250.00 100.00 250.00
9 Giral Stage-I Unit-1 125.00 100.00 125.00
10 Dholpur GTPP Unit-1 110.00 100.00 110.00
SUB-TOTAL (b) 2643.50 2643.50
(c) OTHERS      
1 Wind Power,RREC 41.550 100.00 41.550
2 Wind Power,RSMML 37.300 100.00 37.300
3 Wind Power, (Investors of Suzlon Energy Ltd.) 148.750 100.00 148.750
4 Wind Power, (Investors of Enercon India Ltd.) 235.170 100.00 235.170
5 Wind Power, (NEPC) 0.675 100.00 0.675
6 M/s Kalpataru Power Ltd. (Biomass) 15.800 100.00 15.800
7 M/s Chambal Power Ltd. (Biomass) 7.500 100.00 7.500
8 M/s Amrit Enviromental Power Ltd. (Biomass) 8.000 100.00 8.000
9 Wind Power, (Vestas) 1.200 100.00 1.200
SUB-TOTAL (c) 495.945 495.945
TOTAL-1 (a+b+c) 3303.295 3303.295
2 SHARED PROJECTS      
(a) HYDRO      
1 B.B.M.B. Complex 
(a) Bhakra Left Bank(5x108) 540.00 15.22 82.18
(b) Bhakra Right Bank (5x157) 785.00 15.22 119.48
(c) Kotla (1x29.25+1x24.2+1x24.2) 77.65 15.22 11.82
(d) Ganguwal (1x29.25+1x24.2+1x24.2) 77.65 15.22 11.82
(e) Dehar (6x165) 990.00 20.00 198.00
(f) Pong (6x66) 396.00 58.50 231.66
2 Chambal Complex 
(a) Gandhi Sagar (5x23) 115.00 50.00 57.50
(b) Rana Pratap Sagar (4x43) 172.00 50.00 86.00
(c) Jawahar Sagar (3x33) 99.00 50.00 49.50
SUB-TOTAL (a) 3252.30 847.95
(b) THERMAL / GAS      
1 Satpura (5x62.5) 312.50 40.00 125.00
SUB-TOTAL (b) 312.50 125.00
TOTAL-2 (a+b) 3564.80 972.95
3 CENTRAL SECTOR PROJECTS Installed Capacity (MW) Raj. Share % Available capacity to Raj. (MW)
  ALLOCATION
(a) HYDRO (NHPC)      
1 Tanakpur (3x31.4) 94.20 11.53 10.861
2 Salal Stage -I & II (690) 690.00 2.95 20.355
3 Chamera -I (3x180) 540.00 19.60 105.840
4 Uri (4x120) 480.00 8.96 43.008
5 Chamera -II (3x100) 300.00 9.67 29.010
6 NJPS (6x250) 1500.00 7.47 112.000
7 Dhauli Ganga (4x70) 280.00 9.64 27.000
8 Tehri Stage-1 (Unit-I to IV) (4x250) 1000.00 7.5 75.000
9 Dulhasti HEP (Unit-I to III) (3x130) 390.00 10.88 42.420
SUB-TOTAL (a) 5274.20 465.49
(b) THERMAL / GAS (NTPC)      
1 Singrauli (5x200+2x500) 2000.00 15.00 300.00
2 Rihand TPS  Stage-I (2x500) 1000.00 9.50 95.00
3 Rihand TPS  Stage-II (2x500) 1000.00 10.00 100.00
4 Anta Gas (3x88.71+1x153.2) 419.33 19.81 83.07
5 Auria Gas (4x111.19+2x109.3) 663.36 9.20 61.03
6 Dadri Gas (4x130.19+2x154.5) 829.76 9.28 77.00
7 Unchahar TPS (2x210) 420.00 4.76 20.00
8 Unchahar TPS Stage - II (2x210) 420.00 9.05 38.00
9 Unchahar TPS Stage - III (1x210) 210.00 10.95 23.00
10 Kahalgaon Stage - II (3x500), Unit- 1 (1x500) 500.00 4.86 24.30
11 E. R. (in lieu of Tala-2x170 MW)
(i) Farakka (0.84%+0.11%) 1600 0.95 15.20
(ii) Kahalgaon (0.84%+3.17%) 840 4.01 33.68
(iii) Talchar (0.84%) 1000 0.84 8.40
10902.45 878.68
(c) NUCLEAR (NPC)      
1 RAPP(1x100+1x200) 300.00 100.00 300.00
2 NAPS (2x220) 440.00 10.00 44.00
3 RAPP Extn. (1x220) Unit-3 220.00 28.41 62.50
4 RAPP Extn. (1x220) Unit-4 220.00 28.41 62.50
SUB-TOTAL (c) 1180.00 469.00
TOTAL- 3 (a+b+c) 17356.65 1813.18
GRAND TOTAL (1+2+3) 24224.75 6089.43
4 Allocation of  Unallocated quota  from Central Sector Generating Stations as on 31-3-07 286.50
  Capacity added/ decrease during Apr-06 to March-07  Increase/ decrease in Installed Capacity (MW) / Comm. Date Raj. Share % Available capacity to Raj. (MW)
1 Giral Stage-I Unit-1 125 / 28-2-07 100.00 125.00
2 Dholpur GTPP- Unit-1 110/ 29-3-07 100.00 110.00
3 Wind Power,RREC 4.80 100.00 4.80
4 Wind Power,RSMML 15.00 100.00 15.00
5 Wind Power, (Investors of Enercon India Ltd.) 76.80 100.00 76.80
6 Wind Power, (Investors of Suzlon India Ltd.) 13.95 100.00 13.95
7 Wind Power, (Vestas) 1.20 / March-07 100.00 1.20
8 M/s Amrit Enviromental Power Ltd. (Biomass) 8.00/Sept-06 100.00 8.00
9 M/s Kalpataru Power Ltd. (Biomass) 8.8/ Nov-06 100.00 8.80
10 Rihand TPS  Stage-II (1x500) 500/1-4-06 10.00 50.00
11 Tehri Stage-1 (Unit-I to IV) (4x250 MW) 1000.00 7.50 75.00
12 Dulhasti HEP (Unit-I to III) (3x130) 390.00 10.88 42.420
13 Unchahar TPS Stage - III (1x210) 210.00 10.95 23.00
14 Kahalgaon Stage - II (3x500), Unit- 1 (1x500) 500.00 4.86 24.30
15 E. R. (in lieu of Tala-2x170 MW) 57.28
TOTAL INCREASE  635.55